![Fayat Group Dynapac CP2100 Instruction Manual Download Page 83](http://html1.mh-extra.com/html/fayat-group/dynapac-cp2100/dynapac-cp2100_instruction-manual_4599058083.webp)
Specifications
2020-01-06
4812314580EN
77
Specifications
WEIGHTS
Operational weight with ROPS and series
equipment
9,450 kg
(20,828 lb)
Weight without ballast
9,050 kg
(19,947 lb)
Weight with ballast, wet sand
15,810 kg
(34,846 lb)
Weight with maximum ballast
21,000 kg
(46,285 lb)
The roller can use 16 ballast blocks inside the frame. Each
block is 1,102 lb (500 kg) and is used individually. Eight of
them are in the front part and eight are in the rear part, so use
a proper combination to obtain the maximum of the ballast.
The roller working weight consists of the machine weight and
the ballast weight. Thicker layers demand a heavier machine
for compacting, and thinner layers do not need a machine that
heavy.
FILLING VOLUMES
Hydraulic oil reservoir
95 L (25.09 gal.)
Hydraulic oil system
35 L (9.24 gal.)
T engine lubricant oil
2x8 L (0.5x2.11 gal)
Diesel engine lubricating oil
7.4 L (1.95 gal.)
Diesel engine coolant
14.6 L (3.85 gal.)
Fuel tank
210 L (55.47 gal.)
Water tank
415 L (109.63 gal.)
Sand ballast box volume (total)
3.38 m³
ELECTRICAL SYSTEM
Battery
2 x 12 V / 74 Ah (24V)
Alternator
24 V 60A
Fuses
Refer to "Fuses" in the
"Electrical System"
section
.
Summary of Contents for Dynapac CP2100
Page 2: ......
Page 3: ......
Page 5: ......
Page 6: ......
Page 9: ...Introduction 2020 01 06 4812314580EN 3...
Page 17: ...Technical specifications 2020 01 06 4812314580EN 11...
Page 24: ...Safety decals description and location 18 4812314580EN 2020 01 06...
Page 29: ...Instrument controls Description and function 2020 01 06 4812314580EN 23...
Page 36: ...Instrument controls Description and function 30 4812314580EN 2020 01 06...
Page 39: ...Instrument controls Description and function 2020 01 06 4812314580EN 33...
Page 46: ...Emergency procedures 40 4812314580EN 2020 01 06...
Page 50: ...Instruments controls Cab 44 4812314580EN 2020 01 06...
Page 67: ...Operation 2020 01 06 4812314580EN 61...
Page 75: ...Transport 2020 01 06 4812314580EN 69...
Page 77: ...Operation instructions Overview 2020 01 06 4812314580EN 71...
Page 79: ...Preventive maintenance 2020 01 06 4812314580EN 73...
Page 91: ...Scheduled maintenance and lubrication 2020 01 06 4812314580EN 85...
Page 106: ...Maintenance Every 50 hours 100 4812314580EN 2020 01 06...
Page 129: ......