![Fayat Group Dynapac CP2100 Instruction Manual Download Page 32](http://html1.mh-extra.com/html/fayat-group/dynapac-cp2100/dynapac-cp2100_instruction-manual_4599058032.webp)
Instrument/controls - Description and function
26
4812314580EN
2020-01-06
Instrument/controls - Description and function
(cont.)
No.
DESIGNATION
SYMBOL
FUNCTION
22
Control panel
-
It shows the engine and transmission
functions. Refer to the Section: "Before
Starting".
23
Function buttons (5)
-
24
Brake test pedal
Press it to test the brakes.
25
Parking brake
When it is pressed, the parking brake is
activated.
To turn it off, slide the red part backwards
(towards you) and change the switch
position.
NOTE:
to start the machine, the parking
brake shall be activated.
26
Edge cutter
The edge cutter can be moved up and
down when machine is in work postion.
27
Edge cutter sprinkler
Press to activate the edge cutter sprinkler.
Summary of Contents for Dynapac CP2100
Page 2: ......
Page 3: ......
Page 5: ......
Page 6: ......
Page 9: ...Introduction 2020 01 06 4812314580EN 3...
Page 17: ...Technical specifications 2020 01 06 4812314580EN 11...
Page 24: ...Safety decals description and location 18 4812314580EN 2020 01 06...
Page 29: ...Instrument controls Description and function 2020 01 06 4812314580EN 23...
Page 36: ...Instrument controls Description and function 30 4812314580EN 2020 01 06...
Page 39: ...Instrument controls Description and function 2020 01 06 4812314580EN 33...
Page 46: ...Emergency procedures 40 4812314580EN 2020 01 06...
Page 50: ...Instruments controls Cab 44 4812314580EN 2020 01 06...
Page 67: ...Operation 2020 01 06 4812314580EN 61...
Page 75: ...Transport 2020 01 06 4812314580EN 69...
Page 77: ...Operation instructions Overview 2020 01 06 4812314580EN 71...
Page 79: ...Preventive maintenance 2020 01 06 4812314580EN 73...
Page 91: ...Scheduled maintenance and lubrication 2020 01 06 4812314580EN 85...
Page 106: ...Maintenance Every 50 hours 100 4812314580EN 2020 01 06...
Page 129: ......