![Fayat Group Dynapac CP2100 Instruction Manual Download Page 69](http://html1.mh-extra.com/html/fayat-group/dynapac-cp2100/dynapac-cp2100_instruction-manual_4599058069.webp)
Parking
2020-01-06
4812314580EN
63
Hydraulic oil reservoir
Fill the hydraulic reservoir until the uppermost level mark
(refer to the section "Every 10 Hours of Operation").
Tires
Make sure the tires pressure is at least 200 kPa (29 PSI).
Place supports under the chassis so that the tires are not
overloaded.
Steering cylinder, hinges, etc.
Grease the steering cylinder plunger spindle to preserve it.
Also lubricate the hingers on the engine compartment and cab
doors.
Hoods, tarpaulin
Lower the instruments hood/covering over the instrument
panel.
Cover the entire roller with a tarpaulin. It shall have a gap
between it and the ground.
If possible, store the machine indoors and preferably in a
place with regular temperature.
When stopping and parking the equipment, always apply the
parking brake.
As a precaution measure, chock the roller tires when parking
on slopes and turn off the engine.
To prevent accidents, when parking on slopes,
stop transversally to the road towards the slope.
Never leave the roller with the engine running.
Before leaving it, apply the emergency/parking
brake.
Make sure the roller is parked in a safe place and
that it is not obstructing the traffic.
Summary of Contents for Dynapac CP2100
Page 2: ......
Page 3: ......
Page 5: ......
Page 6: ......
Page 9: ...Introduction 2020 01 06 4812314580EN 3...
Page 17: ...Technical specifications 2020 01 06 4812314580EN 11...
Page 24: ...Safety decals description and location 18 4812314580EN 2020 01 06...
Page 29: ...Instrument controls Description and function 2020 01 06 4812314580EN 23...
Page 36: ...Instrument controls Description and function 30 4812314580EN 2020 01 06...
Page 39: ...Instrument controls Description and function 2020 01 06 4812314580EN 33...
Page 46: ...Emergency procedures 40 4812314580EN 2020 01 06...
Page 50: ...Instruments controls Cab 44 4812314580EN 2020 01 06...
Page 67: ...Operation 2020 01 06 4812314580EN 61...
Page 75: ...Transport 2020 01 06 4812314580EN 69...
Page 77: ...Operation instructions Overview 2020 01 06 4812314580EN 71...
Page 79: ...Preventive maintenance 2020 01 06 4812314580EN 73...
Page 91: ...Scheduled maintenance and lubrication 2020 01 06 4812314580EN 85...
Page 106: ...Maintenance Every 50 hours 100 4812314580EN 2020 01 06...
Page 129: ......