![Fayat Group Dynapac CP2100 Instruction Manual Download Page 125](http://html1.mh-extra.com/html/fayat-group/dynapac-cp2100/dynapac-cp2100_instruction-manual_4599058125.webp)
Electrical system
2020-01-06
4812314580EN
119
Electrical system
The machine's main control box (1) is located on the rear of
the operator platform. There is a plastic cap over it and the
fuses.
A 24V jack is available in the plastic cap.
The fuses inside the engine compartment are located
alongside the battery master switch.
The roller is equipped with a 24V electrical system, supplied
by an AC alternator.
Connect the batteries to the correct polarities
(negative posts to the mass). NEVER disconnect
the cable between the battery and the alternator
when the engine is operating.
1
Fig. - Main control box
1. ECU
2. Fuses
3. Main relay
2
1
Fig. - Battery compartment
1. Master switch
2. Main fuses panel
2
3
Summary of Contents for Dynapac CP2100
Page 2: ......
Page 3: ......
Page 5: ......
Page 6: ......
Page 9: ...Introduction 2020 01 06 4812314580EN 3...
Page 17: ...Technical specifications 2020 01 06 4812314580EN 11...
Page 24: ...Safety decals description and location 18 4812314580EN 2020 01 06...
Page 29: ...Instrument controls Description and function 2020 01 06 4812314580EN 23...
Page 36: ...Instrument controls Description and function 30 4812314580EN 2020 01 06...
Page 39: ...Instrument controls Description and function 2020 01 06 4812314580EN 33...
Page 46: ...Emergency procedures 40 4812314580EN 2020 01 06...
Page 50: ...Instruments controls Cab 44 4812314580EN 2020 01 06...
Page 67: ...Operation 2020 01 06 4812314580EN 61...
Page 75: ...Transport 2020 01 06 4812314580EN 69...
Page 77: ...Operation instructions Overview 2020 01 06 4812314580EN 71...
Page 79: ...Preventive maintenance 2020 01 06 4812314580EN 73...
Page 91: ...Scheduled maintenance and lubrication 2020 01 06 4812314580EN 85...
Page 106: ...Maintenance Every 50 hours 100 4812314580EN 2020 01 06...
Page 129: ......