Towing
Short distance towing with the engine running
The roller can be moved up to 984 feet (300 meters),
according to the following instructions:
To tow the machine, use the same lifting points.
1.
Park the roller on a flat and safe place. If necessary,
chock the tires.
2. Open the hood and check if the propulsion pump is
accessible.
3. On the pump, there are two by-pass valves (1) (hexagonal
bolts) which should be turned three turns anticlockwise to
put the whole system in the by-pass mode, which means
that the A and B sides of the pump are freely connected to
the pressure side. This function allows the machine to be
moved without the drive shaft rotating.
4. Start the Diesel engine and run it in idle.
5. Move the forward/backward lever in one of the two
positions. If it is in a neutral position, the hydraulic engine
brakes are activated.
6. The roller can be towed and even steered now, if the
steering system is working.
7. To leave the by-pass mode, turn both valves (1) three
times to the right.
The machine must not be moved in a speed higher
than 5 km/h and over 984 feet (300 meters). If it
happens, there are risks of damage in the
transmission system. Make sure the towing valves
are reseted (turning them three times to the right)
after the towing.
Fig. - Transmission pump
1. By-pass valves
1
Summary of Contents for Dynapac CP2100
Page 2: ......
Page 3: ......
Page 5: ......
Page 6: ......
Page 9: ...Introduction 2020 01 06 4812314580EN 3...
Page 17: ...Technical specifications 2020 01 06 4812314580EN 11...
Page 24: ...Safety decals description and location 18 4812314580EN 2020 01 06...
Page 29: ...Instrument controls Description and function 2020 01 06 4812314580EN 23...
Page 36: ...Instrument controls Description and function 30 4812314580EN 2020 01 06...
Page 39: ...Instrument controls Description and function 2020 01 06 4812314580EN 33...
Page 46: ...Emergency procedures 40 4812314580EN 2020 01 06...
Page 50: ...Instruments controls Cab 44 4812314580EN 2020 01 06...
Page 67: ...Operation 2020 01 06 4812314580EN 61...
Page 75: ...Transport 2020 01 06 4812314580EN 69...
Page 77: ...Operation instructions Overview 2020 01 06 4812314580EN 71...
Page 79: ...Preventive maintenance 2020 01 06 4812314580EN 73...
Page 91: ...Scheduled maintenance and lubrication 2020 01 06 4812314580EN 85...
Page 106: ...Maintenance Every 50 hours 100 4812314580EN 2020 01 06...
Page 129: ......