![Fayat Group BOMAG BW 900-50 Service Manual Download Page 55](http://html1.mh-extra.com/html/fayat-group/bomag-bw-900-50/bomag-bw-900-50_service-manual_546898055.webp)
6.9
Check, adjust the idle speed
BOMAG
58
008 921 86
6.9
Check, adjust the idle speed
!
Caution
We recommend to have this work carried out by
trained personnel or our after sales service.
Check and adjust only at operating temperature of
the engine.
Setting: 1400 ± 150 min
-1
Fig. 19
l
Run the engine to warm it up to operating tempera-
ture.
l
Adjust the engine idling speed with the setscrew (1)
(Fig. 15).
6.10 Checking fuel lines and
clamps
!
Danger
Danger of burning!
Perform inspection work only after the engine has
cooled down and with the engine stopped.
!
Caution
If fuel lines or hose clamps are found to be dam-
aged, the corresponding parts must be immedi-
ately repaired or replaced.
After replacing lines or hose clamps the fuel sys-
tem needs to be bled.
Disassembled or new fuel lines must be closed
with clean cloths on both ends, to make sure that
no dirt will enter into the fuel system. Dirt particles
can destroy the injection pump.
Fig. 20
l
Check the condition and tight fit of all fuel lines (1)
(Fig. 20) and hose clamps.
l
Replace damaged parts immediately with original
spare parts.
Go
to
Discount-Equipment.com
to
order
your
parts