![Fayat Group BOMAG BW 900-50 Service Manual Download Page 134](http://html1.mh-extra.com/html/fayat-group/bomag-bw-900-50/bomag-bw-900-50_service-manual_546898134.webp)
10.5
Asembling the vibrating drum
BOMAG
140
008 921 86
8. Tighten all rubber buffers 1 (Fig. 15) with a match-
ing rubber buffer mounting bell.
Tightening torque for rubber buffers:
211 Nm
Installing the travel motor
9. Tighten all rubber buffers 1 (Fig. 16) with a match-
ing rubber buffer mounting bell.
Tightening torque for rubber buffers:
211 Nm
10. Mount the travel motor with fastening screws 1
(Fig. 17) and nuts to the support leg.
11. Assemble the feather key (2) for the travel motor.
12. Assemble the drive disc 2 (Fig. 2) with fastening
nuts (1) to the travel motor.
Tightening torque:
407 to 542 Nm
Fig. 15
Fig. 16
Fig. 17
Fig. 18
Go
to
Discount-Equipment.com
to
order
your
parts