![Fayat Group BOMAG BW 900-50 Service Manual Download Page 131](http://html1.mh-extra.com/html/fayat-group/bomag-bw-900-50/bomag-bw-900-50_service-manual_546898131.webp)
Asembling the vibrating drum
BOMAG
137
008 921 86
10.5
4. Install the seal ring 2 (Fig. 4) on both ends of the
exciter shaft.
i
Note
Lubricate the bearing seat areas.
!
Danger
Danger of burning!
Wear protective gloves
5. Heat the inner bearing races (1) up to approx.
80°C and slide them on the exciter shaft from
both ends.
6. Install coupling hub 1 (Fig. 5).
!
Caution
Danger of squashing!
7. Guide the exciter shaft into the opposite cylinder
roller bearing (Fig. 6).
8. Slide the bearing flange over the exciter shaft and
fasten it with screws 1 (Fig. 7).
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Go
to
Discount-Equipment.com
to
order
your
parts