Removing and installing the vibrating drum
BOMAG
129
008 921 86
10.3
Installing the drum
12. Examine all rubber buffers 1 (Fig. 4) for wear, re-
place if necessary.
i
Note
Tighten the rubber buffers with 211 Nm.
Install the drum in reverse order, for this purpose
move the drum with attached travel motor and
support legs parallel into the frame. Fasten the
support legs under pre-load and reconnect the
hydraulic hoses.
Adjusting the pre-load of the rubber buffers
!
Caution
Install the support legs under pre-load.
The preload of the rubber buffers is achieved
by a gap "X" (Fig. 5) between support leg and
spacer block when tightening.
Nominal value: Distance X = 1mm
i
Note
If necessary attach compensation shims on either
side.
13. Check the hydraulic oil level (Fig. 6), top up if nec-
essary.
!
Caution
Bleed the travel circuit before starting opera-
tion.
14. Perform a test drive, check function of travel sys-
tem, vibration and water sprinkling system.
15. Check all connections and fittings for leak tight-
ness.
Fig. 4
Fig. 5
Fig. 6