![Fayat Group BOMAG BW 900-50 Service Manual Download Page 113](http://html1.mh-extra.com/html/fayat-group/bomag-bw-900-50/bomag-bw-900-50_service-manual_546898113.webp)
Flushing the travel system
BOMAG
117
008 921 86
9.4
Bleeding the travel circuit
i
Note
Bleed the travel circuit, see chapter "Bleeding the
travel circuit" .
Flushing the hoses
4. Block the drums with suitable chocks.
i
Note
Keep circulating the complete tank content with
the filling and filtering unit throughout the entire
flushing process.
!
Caution
Move the travel lever only to travel direction
forward, as otherwise the flushing filter will be
subjected to oil flow from the wrong direction.
5. Start the engine and shift the travel lever to travel
direction forward.
6. Perform the flushing process at various engine
speeds for approx. 10 minutes.
7. Shut down the engine.
8. Reconnect the high pressure hoses to the drum
drive motors.
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Go
to
Discount-Equipment.com
to
order
your
parts