
February 2017
www.farmscanag.com
AM-74V1-4
61
Tank Setup
METHOD 2: FULL SYSTEM CALIBRATION (CALCULATED METHOD)
A full system calibration is preferred as it takes into account any subtleties and variances with the machine
and flow meter. A minimum 10L container is recommended or measuring jug.
There are three variations on a Full System Calibration:
1.
Count : Volume of discharge per pulse counts received from flow meter (Not Preferred)
2.
Time : Volume of discharge in a set period of time per pulse counts received from flow meter
3.
Volume : Mass of discharge per pulse counts received from flow meter
To perform a Full System Calibration select Calibration Setup.
1.
Select the Calibration Method from the dropdown list as VOLUME or TIME
2.
Select the RATE SET from the dropdown list as % of Maximum Output
3.
Enter the Calibration Rate in Percentage at 50%. (This will open the control valve to half rate as not
to cause any damage to your pump)
4.
Select the green Tick button to return to the previous screen.
1
2
3
4