25
CH27 ACR & ACC
MOUNTING OF THE DISCHARGE
PIPE
1. Mount the lower part of the discharge pipe (A) using
the mounting hardware (B). Always clamp the lower
part with levers (C) (fig. 1).
2. Lift the discharge pipe to the correct height and in-
sert the M20x260 pin (D).
3. Move the discharge pipe to the working position and
secure it using the wing nut (E) (fig. 2).
4. The long discharge pipe (F) is assembled on the
floor before it is mounted at the correct position in
the same way as the short discharge pipe. Insert the
M20x260 pin (D), set the discharge pipe to the up-
per position and secure it using the wing nut.
If the chipper is equipped with an optional discharge pipe
control device, the latter must be mounted on the chip-
per before the discharge pipe. First, the control device is
mounted to the chipper using the lock band and then the
discharge pipe is installed to the control device as desc-
ribed above.
Fig. 1.
Summary of Contents for CH27 ACC
Page 2: ......
Page 17: ...17 CH27 ACR ACC DIMENSIONS CH27ACR CH27ACC TRANSPORT POSITION CH27ACC SL27 HK4670 ...
Page 31: ...31 CH27 ACR ACC BC3000 CH27 1 2 3 ...
Page 32: ...32 CH27 ACR ACC BC3000 CH27 4 5 6 ...
Page 34: ...34 ...
Page 74: ...74 CH27 ACR ACC 200003767 SMART FEED BASIC CABIN 1 CHIPPER CABIN 2 1 6 5 4 3 2 7 ...
Page 97: ...97 ...
Page 105: ...105 ...
Page 117: ...117 ...
Page 121: ...121 CH27 ACR ACC 200002373 CROSS BREAKER ACCESSORY ...
Page 122: ...122 ...
Page 128: ...Farmi Forest Ahmolantie 6 74510 IISALMI FINLAND 358 0 17 832 4400 info farmiforest fi ...