Before proceeding with the start-up procedures, the 
operator should check the following: 
 

1.  The Separator support legs are firmly bolted on 

the floor of the platform. 

2.  The rotation of the auger is counter-clockwise 

(if not, interchange two power wire contacts, for 
3-phase electrical supply) 

3.  The influent flow or method of supply of liquid 

to be separated is operational. In case of a 
pump, insure that the rotation of the pump is in 
the correct direction (this, too, can be achieved 
with switching power wires, in 3-phase 
electrical supplies). 

4.  A firm plug has been formed (see also Chapter 

3.1).  

5.  The stoppage sealing (seal) in the mounting 

flange is supplied with "stoppage medium" (see 
Chapter 4.1). If grease is used as the 
"stoppage medium," 3 – 5 cm

3

 grease has to be 

supplied through the grease nipple on the 
mounting flange (see also Figure 4.1) before 
start up, to fill the labyrinth seal. 

 

so genannten Tippbetrieb mit einem harten Pfropfen 
wieder anzufahren, da es hierdurch zu Schäden an der 
Maschine kommen kann. 
Bevor Sie mit der Inbetriebnahme beginnen, sind 
folgende Maßnamen zu prüfen: 

1.  Der Separator muss fest auf dem Boden 

verankert sein. 

2.  Drehrichtung der Schnecke kontrollieren. Die 

Schnecke muss vom Presskopf aus gesehen 
gegen Uhrzeigersinn laufen [Wenn dies nicht 
der Fall ist, sind bei einer 3 
Phasenstromversorgung 2 Phasen 
untereinander zu vertauschen]. 

3.  Der Materialzu- und -ablauf am PSS ist 

sichergestellt. Im Falle der Materialversorgung 
mit einer Pumpe ist die Drehrichtung der 
Pumpe zu kontrollieren und ggfs. zu 
korrigieren. 

4.  Es wurde ein Hilfspfropfen zum Anfahren 

eingebracht (siehe Kap. 3.1).  

5.  Versorgung mit Sperrmedium, siehe auch Kap. 

4.1. Bei der Verwendung von Fett als 
Sperrmedium ist vor der Inbetriebnahme 3 bis 5 
cm

3

 Fett über den Schmiernippel [siehe Abb. 

4.1] einzubringen, um die Labyrinthdichtung zu 
füllen. 

 

3.1

 

Create a Start-Up Plug 

To create the “start-up" plug with fibrous materials, 

disconnect the main power switch

 in the panel, and 

proceed as follows: 
 

1.  Remove the counterweights from the arms of 

the flap gates of the mouthpiece. This will allow 
the flap gates to be opened, and expose the 
annular space into which a plug will be formed. 

2.  Fill the annulus of the mouthpiece, beginning at  

the end of the auger flights, with a mixture of 
wet fibrous solids. If possible, utilize the solids 
that are in the liquid to be treated. 

3.  Compress the mixture into a uniform plug using 

a wood dowel or paddle. The plug should 
extend beyond the edges of the mouthpiece 
and into the surface of the flap gates. 

4.  Replace the counterweights on the arms of the 

flap gates; place them at the middle on each  
side; the arms would be slightly tilted upwards 
(not horizontal), if the plug is properly created. 

 

3.1

 

Hilfspfropfen einbringen 

Um den Hilfspfropfen aus Papier oder ähnlichem 
Material zu bilden, ist vor Arbeitsbeginn zu 
kontrollieren, dass der 

Schaltschrank vom Stromnetz 

getrennt

 ist und nicht unter Spannung stehen kann. 

Gehen Sie dann wie folgt vor: 

1.  Entfernen Sie die 4 Gewichte auf den Armen 

des Ausstoßreglers, um die 
Ausstoßreglerklappen zu öffnen und sichern 
Sie die Klappen. 

2.  Der Hilfspfropfen aus feuchtem Papier oder 

ähnlichem Material wird bis zu den Enden der 
Schneckenflügel in das Mundstück des 
Separators eingebracht. 

3.  Um sicherzugehen, dass der Pfropfen 

genügend Verschluss zur Flüssigkeit bildet, ist 
dieser zum Beispiel mit einem Rundholz 
gleichmäßig zu verdichten.  

4.  Positionieren sie je ein Gewicht in mittlerer 

Position auf den Ausstoßreglerarmen. Die 
Andruckklappen des Ausstoßreglers müssen 
sich so an den Hilfspfropfen anlegen, dass bei 
Beginn der Inbetriebnahme ein Druck im 
Pfropfen aufgebaut wird. Bei der Bildung eines 
geeigneten Pfropfens werden sich die 
Ausstoßreglerarme langsam aufwärts 
bewegen. 

 

3.2

 

Commissioning 

Before starting the Separator it is critical that the 

sump 

3.2

 

Inbetriebnahme 

Bevor Sie die Maschine anfahren, sollte sichergestellt 

Summary of Contents for PSS 1.2

Page 1: ...SERVICE MANUAL FAN PSS 1 2 ENGL DEUT MAI 2009_NEU PAGE 1 OF 45 FAN PRESS SCREW SEPARATOR PSS 1 2 FAN PRESS SCHNECKEN SEPARATOR PSS 1 2...

Page 2: ...3 LIQUID CLARIFICATION 40 INHALTSVERZEICHNIS 1 Allgemeine Hinweise 3 1 1 AUSLIEFERUNGSZUSTAND 3 1 2 WARNUNGEN UND SICHERHEITSHINWEISE 3 1 3 AUSSTATTUNG IDENTIFIKATION UND INFORMATION 4 2 Installation...

Page 3: ...u starten m ssen Sie einen Hilfspfropfen formen 1 2 Warnings and Safety Instructions Be sure to keep hands away from all moving parts disconnect electrical power when adjusting or servicing the equipm...

Page 4: ...atzverh ltnisse nicht eingesetzt werden k nnen m ssen fest montierte Leitern mit R ckenschutz verwendet werden Achtung Die Bedienungs und Betriebsanleitung muss sehr genau gelesen und beachtet werden...

Page 5: ...und den Schaltschrank besteht Vergewissern Sie sich dass vom Schaltschrank aus ein ungehinderter Blick auf den Presskopf und die Funktion des PSS m glich ist eine Betrachtung des Pfropfens und seiner...

Page 6: ...llow the separated solids to drop onto a truck or trailer set up indoor or out and fed by gravity or pump see Figure 2 4 If you need assistance contact your dealer or our nearest office for ideas on s...

Page 7: ...rols for the associated equipment such as feed pumps liquid float switches etc Standard drawings showing the wiring for the entire electrical control system the circuits and the points of connection d...

Page 8: ...rank und Ihrer rtlichen Stromversorgung In Abh ngigkeit von der Motorausf hrung muss dieser entweder im Dreieck oder im Stern Y angeklemmt werden Ihr Elektriker kann Ihnen dazu entsprechende Informati...

Page 9: ...otors ist derart anzuschlie en dass die Schnecke vom Presskopf aus gesehen entgegen dem Uhrzeigersinn dreht siehe roten Pfeil auf Mundst ck des Presskopfes Ist dies nicht der Fall so sind zwei der str...

Page 10: ...rate an overflow by pass is necessary to prevent overloading of the Separator In the case of gravity feed to the Separator a level control by a float switch may be necessary to maintain head pressure...

Page 11: ...wird Von entscheidender Wichtigkeit ist die richtige Auswahl der Pumpe des R hrwerkes und der Versorgungs und Entsorgungsleitungen Das Effluent sollte ber einen freien und damit ent bel fteten Ablauf...

Page 12: ...den Separationsproze durch einen sich bildenden Feststoffpfropfen aus dem separierten Medium ersetzt und herausgedr ckt Ein Hilfspfropfen ist jeweils dann zu formen wenn der Feststoffpfropfen zu Reini...

Page 13: ...chtung zu f llen 3 1 Create a Start Up Plug To create the start up plug with fibrous materials disconnect the main power switch in the panel and proceed as follows 1 Remove the counterweights from the...

Page 14: ...em will start and will also stop automatically werden dass der Zulauftank f r den Separator von Fremdk rpern wie N gel Steine Abfall oder anderen abrasiven Stoffen gereinigt wurde da diese die Pumpe u...

Page 15: ...move up and down If the up and down movement of the weight arms is too big move the counterweights further away from the mouthpiece If the counterweights are very high the plug may be too strong see s...

Page 16: ...vorsichtig an beobachten Sie jedoch das Amperemeter um eine berbelastung des Ger tes zu verhindern M glicherweise muss der Feststoffpfropfen mit hei em Wasser aufgetaut werden bevor der Separator nor...

Page 17: ...hecking tap the stoppage sealing must be replaced dass der gesamte Dichtungsbereich mit Sperrmedium ausgef llt ist Noch besser ist der Einsatz eines automatischen Schmierstoffgebers F r den Einsatz in...

Page 18: ...creen floats The weights in the mouthpiece arms move up and down reflecting the floating of the screen inside the Body 4 2 Inspektion der Siebe und der F hrungsschienen Grunds tzlich sind das Sieb und...

Page 19: ...mpfen und andererseits haben Langzeitversuche eine h here Standzeit ausgewiesen Des Weiteren verschlei en die Edelstahlf hrungsschienen nicht Bei evtl Abnutzung werden lediglich die Kunststoffschiene...

Page 20: ...N Separator B ro die Einstellvorrichtung mit entsprechender Anweisung zur Einstellung der F hrungsschienen anzufordern FIGURE 4 2 T STRIP IN THE SCREEN GUIDE RAILS OF THE PSS LEFT SCREEN GUIDE RAIL WI...

Page 21: ...LS ABB 4 5 SITZ DER FIXIERSCHRAUBEN F R DIE SIEBF HRUNGSSCHIENEN 4 2 1 Inspection of the Screen and re assembly of the Screen The wear on the screen takes place mainly where the auger ends and in the...

Page 22: ...ew hrleistet und das Sieb ist daher besch digt Wenn Sie das Sieb wieder einbauen achten Sie darauf dass das auf dem F hrungsstab des Siebes eingeschlagene Dreieck oben ist 12 Uhr Position siehe auch A...

Page 23: ...the hub connection the axial contact surface and the grooves for the feather keys shown in Figure 4 9 preferably with a high pressure water source Also inspect components for wear marks and dirt Dirt...

Page 24: ...e Schwimmf higkeit ausweichen kann Bevor die Schnecke wieder montiert wird muss die Endscheibe wieder auf die Schnecke aufgesetzt werden wie in Abb 4 10 verdeutlicht Die Endscheibe sollte vor dem Einb...

Page 25: ...GER WITH ENDPLATE AS AN ADDITIONAL PROTECTION FOR THE GEAR MOTOR WITH MOUNTING FLANGE ABB 4 10 SCHNECKE MIT ENDSCHEIBE ALS ZUS TZLICHER SCHUTZ DES GETRIEBEMOTORS MIT ANBAUSATZ FIGURE 4 11 WOBBLING CON...

Page 26: ...igure 4 13 In principle the auger has to be refurbished before the 4 2 3 Beurteilungskriterien f r Schnecke und Siebe hinsichtlich Verschlei und Wiederaufarbeitung Alle bewegten Teile am PSS unterlieg...

Page 27: ...n wichtiges Indizes daf r dass das Sieb ausgetauscht bzw die Schnecke aufgearbeitet werden muss Weiterer Indikator f r die Notwendigkeit der Schneckenaufarbeitung ist das Aussehen der Panzerung wie im...

Page 28: ...ebelarm des Aussto reglers eingestellt werden An die optimalen Einstellungen und damit den normalen Betriebszustand werden Sie sich durch Variation langsam herantasten m ssen Ebenso ist dabei auch die...

Page 29: ...nicht zu einem Transport bzw kontinuierlichen Austrag des Pfropfens Hierbei gilt grunds tzlich je h her und gleichm iger die Einlaufkonzentration an Feststoffen ist umso gr er ist die Austrittsgeschwi...

Page 30: ...inlet box 5 1 2 Durchsatz unter Normalen Betriebsbedingungen Der PSS l uft aber sowohl der Austritt an Feststoffen als auch an Effluent ist weitaus geringer als normalerweise bei dem Medium M gliche U...

Page 31: ...ten wird Die Einstellung erfolgt f r den Lastbetrieb sowohl f r die maximale Stromaufnahme als auch f r die minimale Stromaufnahme Beide Einstellungen k nnen bei Vorlage der notwendigen Bedingung zu e...

Page 32: ...e influent can plug the checking tap after a while It is important therefore to monitor the checking tap on the bottom of the flange Normally nothing should be oozing out Possible trouble From a troub...

Page 33: ...tches with all eight screw holes 7 Screw the cover plate on with the two short bolts and the seal holder with the four long bolts into the gearbox flange and fix all 6 Um die Dichtungen im Sperrdichtu...

Page 34: ...gfs erneuern Ziehen Sie alle 8 Schrauben reihum an 7 Nun k nnen der Getriebemotor sofern dieser abgebaut wurde und der Einlaufkasten wieder montiert werden 8 Nun wird bei laufendem Getriebemotor Sperr...

Page 35: ...n mit den langen Schrauben in den Gewindebohrungen f r die Abdeckplatte Dichtringtr ger Herausziehen Figure Bild 5 3 3 Figure Bild 5 3 4 After exchange of sealrings adjust cover plate Push in Seal hol...

Page 36: ...tieren Sie die Symptome und die von Ihnen getroffenen Ma nahmen zur Beseitigung des Problems Setzen Sie sich mit Ihrem FAN Verk ufer oder dem FAN Service Ingenieur in Verbindung Zu Ihrer Unterst tzung...

Page 37: ...mit Standardpumpen zu f rdern ben tigen ein geringeres Speichervolumen als das Zulaufmedium k nnen weiter ges ubert oder dem jeweiligen Medium entsprechend entsorgt werden Die von FAN Separator entwi...

Page 38: ...nvenience For details contact FAN Separator by fax phone or Email werden Sollte jedoch Fl ssigkeit zwischen Ihren Fingern entweichen und beim ffnen der Hand in dieser Feststoffe verblieben sein so ist...

Page 39: ...m six feet as illustrated in Figure 6 1 6 2 Feststoffbehandlung Der Trockensubstanzgehalt der separierten Feststoffe kann durch eine Trocknung im Freien eine Kompostierung oder eine weitere mechanisc...

Page 40: ...y include oils and fats and some solids that are heavier than the liquid is shown in Figure 6 3 recommended 6 3 Fl ssigkeitsreinigung Abb 6 2 verdeutlicht die Reihenschaltung von 2 PSS wobei das Efflu...

Page 41: ...3 TYPICAL ARRANGEMENT OF A PSS A CCS AND A DAF Abb 6 3 Typische Anordnung von einer PSS einer CCS und einer DAF PUMPED TO FAN DAF FOR CLARIFICATION OF FLOTABLES AND OR TO ACTIVATED SLUDGE AREATION TRE...

Page 42: ...00 320 e mail sales bauer at com www bauer at com Owner or operating authority Name Address Tel Fax Instruction Please note the type and the serial number of your Separator and of the accessories Gebe...

Page 43: ...ales bauer at com www bauer at com Besitzer bzw Betreiber Name Adresse Tel Fax Hinweis Notieren Sie die Typen und Seriennummer Ihres Separators und des Zubeh rs Geben Sie diese Nummern bei jedem Konta...

Page 44: ...general principles for design Part 1 Basic terminology methodology DIN EN 12100 2 Safety of machines Basic concepts general principles for design Part 2 Technical principles and specifications DIN EN...

Page 45: ...eil 1 Grunds tzliche Terminologie Methodik DIN EN 12100 2 Sicherheit von Maschinen Grundbegriffe allgemeine Gestaltungsleits tze Teil 2 Technische Leits tze und Spezifikationen DIN EN 60204 1 Sicherhe...

Reviews: