background image

SERVICE MANUAL 

FAN PSS 1-2 ENGL-DEUT MAI 2009_NEU 

PAGE 11 OF 45 

recommendations are strictly followed.  
 
Air ventilation is necessary at the effluent outlet from 
the Separator. Without ventilation,  particles will be 
drawn into the screen slots in the de-watering area, and 
the associated efficiency of the Separator will be 
significantly decreased. In addition, do not directly 
connect a pump to the effluent outlet on the Separator. 
Where pressurized transfer of the effluent liquids from 
the Separator is desired, the effluent should be 
conveyed by gravity to a sump and pumped from that 
point to prevent a siphon effect on the Separator. 
 
 
 
 
The separated solids can be piled and removed 
periodically, or transported by conveyor belt or truck. 
  
 
 
 
The piping that is provided with the FAN Press Screw 
Separator is a flexible non-collapsible corrugated tube. 
Venting of the inflow pipe line can best be achieved by 
inserting a 1 inch (25 mm) stand pipe in the vent hole 
on the horizontal arm of the T-pipe in the inlet assembly 
(see top drawing of Figure 2.4). Venting is necessary if 
the feed pump is operating at a high flow and pressure, 
in-turn by-passing the overflow pipe and creating 
siphoning conditions. 

 
 
 
Note: 

 

Avoid any coiling, curling, or U-shapes in 
the piping network;  

 

 

Prevent siphoning conditions by keeping 
pipes straight, vent the overflow and the 
discharge, and use non-collapsible tubing; 
and, 

 

 

The discharge from the outlets of the 
overflow by-pass and effluent pipes must 
not be submerged or operate under a back 
pressure condition.

 

den PSS beschränkt. Ein Überlauf ist in diesem Fall 
nicht erforderlich. 
Es ist sehr wichtig, dass die Beschickung des 
Separators auf jeden Fall durch den Schaltschrank 
gesteuert wird. Von entscheidender Wichtigkeit ist die 
richtige Auswahl der Pumpe, des Rührwerkes und der 
Versorgungs- und Entsorgungsleitungen.  
Das Effluent sollte über einen freien und damit ent-
/belüfteten Ablauf entsorgt oder in einer Senkgrube 
gesammelt und anschließend abgepumpt werden, um 
einen Saugeffekt am Separator zu verhindern. Die 
Entlüftung ist erforderlich, da ansonsten Partikel in die 
Siebspalte eingesaugt werden und dort stecken bleiben 
und somit die offene Siebfläche zur Separation als auch 
die Funktionsfähigkeit des Separators beeinträchtigt 
wird. Der separierte Feststoff kann angehäuft und nach 
Erfordernis abtransportiert bzw. auch mit einen 
Transportband abtransportiert oder mit Containern bzw. 
LKW entsorgt werden.  
Bei der mit dem FAN Press Schnecken Separator 
mitgelieferten Zuleitung handelt es sich um einen 
verstärkten und dennoch flexiblen Schlauch. Dieser 
verstärkte Schlauch ist unterdruckfest. Ventilationen an 
der Einlaufleitung können durch den Einsatz eines 25 
mm starken Entlüftungsrohres auf dem T-Stück [siehe 
obere Zeichnung in Abb. 2.4] herbeigeführt werden. In 
dem T-Stück für den Einlauf ist eine entsprechende 
Anschlussmöglichkeit vorhanden, die werksseitig durch 
einen Stopfen verschlossen ist. Die Entlüftung ist bei 
einer Pumpe mit einer recht hohen Förderleistung 
erforderlich, da sonst, durch die hohe 
Strömungsgeschwindigkeit in der Überlaufleitung, ein 
Siphon-Effekt erzeugt würde, der die Beschickung des 
Separators und damit seinen einwandfreien 
Separationsprozeß beeinträchtigen würde. 

Achtung: 

 

Vermeiden Sie Windungen, Durchhänger 
und Verdrillungen in den Rohrleitungen.  

 

Verhindern Sie Siphon-Effekte durch gerade 
Rohrleitungen, die Entlüftung des 
Überlaufes, des Ablaufes und die 
Verwendung von unterdruckfesten 
Schläuchen.  

 

Der Ablauf des Effluents und des 
Überlaufes müssen entlüftet sein und 
dürfen nicht in Flüssigkeit eintauchen, so 
dass es nicht zu Saugeffekten kommt.

 

 

Summary of Contents for PSS 1.2

Page 1: ...SERVICE MANUAL FAN PSS 1 2 ENGL DEUT MAI 2009_NEU PAGE 1 OF 45 FAN PRESS SCREW SEPARATOR PSS 1 2 FAN PRESS SCHNECKEN SEPARATOR PSS 1 2...

Page 2: ...3 LIQUID CLARIFICATION 40 INHALTSVERZEICHNIS 1 Allgemeine Hinweise 3 1 1 AUSLIEFERUNGSZUSTAND 3 1 2 WARNUNGEN UND SICHERHEITSHINWEISE 3 1 3 AUSSTATTUNG IDENTIFIKATION UND INFORMATION 4 2 Installation...

Page 3: ...u starten m ssen Sie einen Hilfspfropfen formen 1 2 Warnings and Safety Instructions Be sure to keep hands away from all moving parts disconnect electrical power when adjusting or servicing the equipm...

Page 4: ...atzverh ltnisse nicht eingesetzt werden k nnen m ssen fest montierte Leitern mit R ckenschutz verwendet werden Achtung Die Bedienungs und Betriebsanleitung muss sehr genau gelesen und beachtet werden...

Page 5: ...und den Schaltschrank besteht Vergewissern Sie sich dass vom Schaltschrank aus ein ungehinderter Blick auf den Presskopf und die Funktion des PSS m glich ist eine Betrachtung des Pfropfens und seiner...

Page 6: ...llow the separated solids to drop onto a truck or trailer set up indoor or out and fed by gravity or pump see Figure 2 4 If you need assistance contact your dealer or our nearest office for ideas on s...

Page 7: ...rols for the associated equipment such as feed pumps liquid float switches etc Standard drawings showing the wiring for the entire electrical control system the circuits and the points of connection d...

Page 8: ...rank und Ihrer rtlichen Stromversorgung In Abh ngigkeit von der Motorausf hrung muss dieser entweder im Dreieck oder im Stern Y angeklemmt werden Ihr Elektriker kann Ihnen dazu entsprechende Informati...

Page 9: ...otors ist derart anzuschlie en dass die Schnecke vom Presskopf aus gesehen entgegen dem Uhrzeigersinn dreht siehe roten Pfeil auf Mundst ck des Presskopfes Ist dies nicht der Fall so sind zwei der str...

Page 10: ...rate an overflow by pass is necessary to prevent overloading of the Separator In the case of gravity feed to the Separator a level control by a float switch may be necessary to maintain head pressure...

Page 11: ...wird Von entscheidender Wichtigkeit ist die richtige Auswahl der Pumpe des R hrwerkes und der Versorgungs und Entsorgungsleitungen Das Effluent sollte ber einen freien und damit ent bel fteten Ablauf...

Page 12: ...den Separationsproze durch einen sich bildenden Feststoffpfropfen aus dem separierten Medium ersetzt und herausgedr ckt Ein Hilfspfropfen ist jeweils dann zu formen wenn der Feststoffpfropfen zu Reini...

Page 13: ...chtung zu f llen 3 1 Create a Start Up Plug To create the start up plug with fibrous materials disconnect the main power switch in the panel and proceed as follows 1 Remove the counterweights from the...

Page 14: ...em will start and will also stop automatically werden dass der Zulauftank f r den Separator von Fremdk rpern wie N gel Steine Abfall oder anderen abrasiven Stoffen gereinigt wurde da diese die Pumpe u...

Page 15: ...move up and down If the up and down movement of the weight arms is too big move the counterweights further away from the mouthpiece If the counterweights are very high the plug may be too strong see s...

Page 16: ...vorsichtig an beobachten Sie jedoch das Amperemeter um eine berbelastung des Ger tes zu verhindern M glicherweise muss der Feststoffpfropfen mit hei em Wasser aufgetaut werden bevor der Separator nor...

Page 17: ...hecking tap the stoppage sealing must be replaced dass der gesamte Dichtungsbereich mit Sperrmedium ausgef llt ist Noch besser ist der Einsatz eines automatischen Schmierstoffgebers F r den Einsatz in...

Page 18: ...creen floats The weights in the mouthpiece arms move up and down reflecting the floating of the screen inside the Body 4 2 Inspektion der Siebe und der F hrungsschienen Grunds tzlich sind das Sieb und...

Page 19: ...mpfen und andererseits haben Langzeitversuche eine h here Standzeit ausgewiesen Des Weiteren verschlei en die Edelstahlf hrungsschienen nicht Bei evtl Abnutzung werden lediglich die Kunststoffschiene...

Page 20: ...N Separator B ro die Einstellvorrichtung mit entsprechender Anweisung zur Einstellung der F hrungsschienen anzufordern FIGURE 4 2 T STRIP IN THE SCREEN GUIDE RAILS OF THE PSS LEFT SCREEN GUIDE RAIL WI...

Page 21: ...LS ABB 4 5 SITZ DER FIXIERSCHRAUBEN F R DIE SIEBF HRUNGSSCHIENEN 4 2 1 Inspection of the Screen and re assembly of the Screen The wear on the screen takes place mainly where the auger ends and in the...

Page 22: ...ew hrleistet und das Sieb ist daher besch digt Wenn Sie das Sieb wieder einbauen achten Sie darauf dass das auf dem F hrungsstab des Siebes eingeschlagene Dreieck oben ist 12 Uhr Position siehe auch A...

Page 23: ...the hub connection the axial contact surface and the grooves for the feather keys shown in Figure 4 9 preferably with a high pressure water source Also inspect components for wear marks and dirt Dirt...

Page 24: ...e Schwimmf higkeit ausweichen kann Bevor die Schnecke wieder montiert wird muss die Endscheibe wieder auf die Schnecke aufgesetzt werden wie in Abb 4 10 verdeutlicht Die Endscheibe sollte vor dem Einb...

Page 25: ...GER WITH ENDPLATE AS AN ADDITIONAL PROTECTION FOR THE GEAR MOTOR WITH MOUNTING FLANGE ABB 4 10 SCHNECKE MIT ENDSCHEIBE ALS ZUS TZLICHER SCHUTZ DES GETRIEBEMOTORS MIT ANBAUSATZ FIGURE 4 11 WOBBLING CON...

Page 26: ...igure 4 13 In principle the auger has to be refurbished before the 4 2 3 Beurteilungskriterien f r Schnecke und Siebe hinsichtlich Verschlei und Wiederaufarbeitung Alle bewegten Teile am PSS unterlieg...

Page 27: ...n wichtiges Indizes daf r dass das Sieb ausgetauscht bzw die Schnecke aufgearbeitet werden muss Weiterer Indikator f r die Notwendigkeit der Schneckenaufarbeitung ist das Aussehen der Panzerung wie im...

Page 28: ...ebelarm des Aussto reglers eingestellt werden An die optimalen Einstellungen und damit den normalen Betriebszustand werden Sie sich durch Variation langsam herantasten m ssen Ebenso ist dabei auch die...

Page 29: ...nicht zu einem Transport bzw kontinuierlichen Austrag des Pfropfens Hierbei gilt grunds tzlich je h her und gleichm iger die Einlaufkonzentration an Feststoffen ist umso gr er ist die Austrittsgeschwi...

Page 30: ...inlet box 5 1 2 Durchsatz unter Normalen Betriebsbedingungen Der PSS l uft aber sowohl der Austritt an Feststoffen als auch an Effluent ist weitaus geringer als normalerweise bei dem Medium M gliche U...

Page 31: ...ten wird Die Einstellung erfolgt f r den Lastbetrieb sowohl f r die maximale Stromaufnahme als auch f r die minimale Stromaufnahme Beide Einstellungen k nnen bei Vorlage der notwendigen Bedingung zu e...

Page 32: ...e influent can plug the checking tap after a while It is important therefore to monitor the checking tap on the bottom of the flange Normally nothing should be oozing out Possible trouble From a troub...

Page 33: ...tches with all eight screw holes 7 Screw the cover plate on with the two short bolts and the seal holder with the four long bolts into the gearbox flange and fix all 6 Um die Dichtungen im Sperrdichtu...

Page 34: ...gfs erneuern Ziehen Sie alle 8 Schrauben reihum an 7 Nun k nnen der Getriebemotor sofern dieser abgebaut wurde und der Einlaufkasten wieder montiert werden 8 Nun wird bei laufendem Getriebemotor Sperr...

Page 35: ...n mit den langen Schrauben in den Gewindebohrungen f r die Abdeckplatte Dichtringtr ger Herausziehen Figure Bild 5 3 3 Figure Bild 5 3 4 After exchange of sealrings adjust cover plate Push in Seal hol...

Page 36: ...tieren Sie die Symptome und die von Ihnen getroffenen Ma nahmen zur Beseitigung des Problems Setzen Sie sich mit Ihrem FAN Verk ufer oder dem FAN Service Ingenieur in Verbindung Zu Ihrer Unterst tzung...

Page 37: ...mit Standardpumpen zu f rdern ben tigen ein geringeres Speichervolumen als das Zulaufmedium k nnen weiter ges ubert oder dem jeweiligen Medium entsprechend entsorgt werden Die von FAN Separator entwi...

Page 38: ...nvenience For details contact FAN Separator by fax phone or Email werden Sollte jedoch Fl ssigkeit zwischen Ihren Fingern entweichen und beim ffnen der Hand in dieser Feststoffe verblieben sein so ist...

Page 39: ...m six feet as illustrated in Figure 6 1 6 2 Feststoffbehandlung Der Trockensubstanzgehalt der separierten Feststoffe kann durch eine Trocknung im Freien eine Kompostierung oder eine weitere mechanisc...

Page 40: ...y include oils and fats and some solids that are heavier than the liquid is shown in Figure 6 3 recommended 6 3 Fl ssigkeitsreinigung Abb 6 2 verdeutlicht die Reihenschaltung von 2 PSS wobei das Efflu...

Page 41: ...3 TYPICAL ARRANGEMENT OF A PSS A CCS AND A DAF Abb 6 3 Typische Anordnung von einer PSS einer CCS und einer DAF PUMPED TO FAN DAF FOR CLARIFICATION OF FLOTABLES AND OR TO ACTIVATED SLUDGE AREATION TRE...

Page 42: ...00 320 e mail sales bauer at com www bauer at com Owner or operating authority Name Address Tel Fax Instruction Please note the type and the serial number of your Separator and of the accessories Gebe...

Page 43: ...ales bauer at com www bauer at com Besitzer bzw Betreiber Name Adresse Tel Fax Hinweis Notieren Sie die Typen und Seriennummer Ihres Separators und des Zubeh rs Geben Sie diese Nummern bei jedem Konta...

Page 44: ...general principles for design Part 1 Basic terminology methodology DIN EN 12100 2 Safety of machines Basic concepts general principles for design Part 2 Technical principles and specifications DIN EN...

Page 45: ...eil 1 Grunds tzliche Terminologie Methodik DIN EN 12100 2 Sicherheit von Maschinen Grundbegriffe allgemeine Gestaltungsleits tze Teil 2 Technische Leits tze und Spezifikationen DIN EN 60204 1 Sicherhe...

Reviews: