SC-F9200 Series
Revision C
ADJUSTMENT
CR Related Adjustments
298
SE Group Confidential (Related Staff Only)
6.
Check the CR TIMING BELT while the CR UNIT is running.
The belt runs in the middle of the driven pulley:
Finish. Perform the <belt tension measurement> (
).
When the belt moves back and forth between both sides or runs on either side:
Go to
Figure 4-15. Slant Adjustment of Driven Pulley
7.
Loosen the screw A of the driven pulley holder.
8.
Adjust the Driven Pulley slant with the slant adjusting screw. After adjusting the
slant, attach the screw A and return to
.
The belt leans to the rear side of the driven pulley:
Rotate the screw in a counterclockwise.
The belt leans to the front side of the Driven Pulley:
Rotate the screw in a clockwise.
Figure 4-16. Screw A and slant adjusting screw
CR TIMING
BELT
Driven
pulley
Driven pulley
Upper
Slant adjusting
screw
Screw A
Summary of Contents for SC-F9200 series
Page 11: ...SE Group Confidential Related Staff Only C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 37: ...SE Group Confidential Related Staff Only C H A P T E R 2 TROUBLESHOOTING ...
Page 76: ...SE Group Confidential Related Staff Only C H A P T E R 3 DISASSEMBLY ASSEMBLY ...
Page 258: ...SE Group Confidential Related Staff Only C H A P T E R 4 ADJUSTMENT ...
Page 365: ...SE Group Confidential Related Staff Only C H A P T E R 5 MAINTENANCE ...
Page 389: ...SE Group Confidential Related Staff Only C H A P T E R 6 APPENDIX ...