SC-F9200 Series
Revision B
DISASSEMBLY & ASSEMBLY
Disassembly and Assembly Procedure
153
SE Group Confidential (Related Staff Only)
3.4.5.5 Head Relay FFC
1.
Remove the Media Loading Lever.
2.
Remove the Panel Unit.
3.
Remove the Right Upper Cover.
4.
Remove the Left Rear Cover.
5.
Remove the Left Upper Cover.
6.
Remove the Upper Cover.
7.
Remove the Board Box Cover.
8.
Remove the Cover. (See
9.
Disconnect the Head Relay FFCs from the connectors (CN400, CN401, CN402,
CN403) on the Sub-D Board.
10. Remove the acetate tape, and release the Head Relay FFCs from the FFC clamp.
Figure 3-91. Removing the Head Relay FFC
11. Disconnect the Head Relay FFCs from the connectors (CN400, CN401, CN402,
CN403) on the Main Board.
12. Pull out the Head Relay FFCs from the main body.
Figure 3-92. Removing the Head Relay FFC
Head Relay FFC
Sub-D Board
CN400
Acetate tape
CN401
CN402
CN403
FFC Holder
Main Board
CN400
CN401
CN402
CN403
Head Relay FFCs
Summary of Contents for SC-F9200 series
Page 11: ...SE Group Confidential Related Staff Only C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 37: ...SE Group Confidential Related Staff Only C H A P T E R 2 TROUBLESHOOTING ...
Page 76: ...SE Group Confidential Related Staff Only C H A P T E R 3 DISASSEMBLY ASSEMBLY ...
Page 258: ...SE Group Confidential Related Staff Only C H A P T E R 4 ADJUSTMENT ...
Page 365: ...SE Group Confidential Related Staff Only C H A P T E R 5 MAINTENANCE ...
Page 389: ...SE Group Confidential Related Staff Only C H A P T E R 6 APPENDIX ...