Page 89
5. Click the left SCHEDULE push-button until the SCHEDULE display shows [
X!,!
].
6. Use the DATA and ENTER push-buttons to program:
[
X!,!
] =
xxxx
, where
xxxx
is: welding transformer ratio rA
WT
= U
P
/ U
S
= I
SECONDARY
/ I
PRIMARY
;
or any number from 0001 to max 0435, 0174, 0087, or 0043 for PT2, PT5,
PT10 or PT20, respectively.
7. Click the SELECT push-button and select CURRENT [%] or [kA].
8. Program the desired Current in [%] (monitoring mode) or in [kA] (compensation and
monitoring mode) for the dialed Schedule.
9. Put the control back in the OPERATE Mode.
Table 8.2.1
Constant Current Ratio Modes with Primary Sensor
PT
designation
Coil Ratio
RANGE
rA
WT
MAX
[
.!X!
]
Compensation Monitoring
PT2
200:5 A/A
200 A
0435
12
13
PT5
500:5 A/A
500 A
0174
14
15
PT10
1000:5 A/A
1000 A
0087
16
17
PT20
2000:5 A/A
2000 A
0043
18
19
All monitoring modes [
.!X!
] = 13, 15, 17, or 19 have following exceptions:
CURRENT
- current in [%] from 0000 (0 %) to 0099 (99%);
7!U!
-
Low
current limit window in [kA] from 00.00 (0 kA) to 99.99 (99.99 kA);
3!O!
-
High
current limit window in [kA] from 00.00 (0 kA) to 99.99 (99.99 kA).
In these monitoring modes also, RMS in [kA] will be always shown on DATA display after
end of the sequence, which may be useful for setting Hi/Low limit window.
NOTE
:
For [
X!,!
] = 0010, schedule parameter current will be programmed in “primary
Amps” and Control will show on display primary current in [A]. This may be useful
if welding transformer ratio is unknown.
8.2.3 SET POINT SETUP FOR PRIMARY COMPENSATION MODE
Since the setup is not required in
Ratio
Mode
the Control will use calibrated gain to operate
and show current on the display. But, depending on the size of the welding transformer, the
size of the primary current transformer and maximum operating range of the machine, Up-
slope or overshoot during the first several cycles of the weld could happen
only
in
compensation mode. This may happen because the Control does not know the correlation
between the percentage of phase shift and the measured current in kA before the weld. In
order to eliminate or minimize the effect of Up-slope or overshoot during compensation, the
following simple set point setup procedure is recommended (but not required).
1. Put the control in PROGRAM Mode.
2. Program one of the monitoring modes [
.!X!
] = 13, 15, 17, or 19.
3. Program the desired Current in [%], 0060 for 60%, for the dialed Schedule, along with
other schedule parameters like SQUEEZE, WELD or HOLD time.
4. Put the control back in the OPERATE Mode.
StockCheck.com
Summary of Contents for EN1000 series
Page 2: ...S t o c k C h e c k c o m ...
Page 19: ...Page 17 Figure 3 6 External SCR Contactor connection S t o c k C h e c k c o m ...
Page 120: ...Page 118 11 3 TROUBLESHOOTING GUIDE S t o c k C h e c k c o m ...
Page 121: ...Page 119 S t o c k C h e c k c o m ...
Page 122: ...Page 120 11 4 BLOCK DIAGRAM S t o c k C h e c k c o m ...