Solimotion FTR20
Commissioning
42
Hauser
• These settings are for adapting the switching function to the downstream analysis (process
control system).
• This setting has no significance for the current output.
8�4�3
Switching delay (function 7 and 8)
An additional switch-on and/or switch-off delay can be configured for the switch output.
This can be used, for example, to stabilize the switch output when the signal strength
fluctuates greatly, so that the relay does not switch until the switch point has been exceeded
or undershot for a corresponding time.
As long as the times in which no bulk solids are detected on the belt or are smaller than the
switch-off delays, the switch output remains in the state "Bulk solids movement detected".
25 Example fluctuating material on conveyor belt
Summary of Contents for Solimotion FTR20
Page 58: ...Solimotion FTR20 58 Endress Hauser ...
Page 60: ...www addresses endress com ...