Solimotion FTR20
Installation
14
Hauser
1
2
3
4
5
6
α
= 45
°
4
Installation position for material detection on conveyor belt
• Choose a location to install the device where application-specific influences will be minimal.
• With vibrating mounting locations it is recommended to use devices with encapsulated
electronics (see ordering structure "Accessory mounted").
For devices intended for use in hazardous areas, please read the information and comply
with the instructions in the Ex documentation (XA).
5�2
Installing the FTR20
5�2�1
Direct mounting with threaded connection
The simplest mounting method is by screwing into the process wall. To do this, a
corresponding internal thread (Rp 1½, 1½ NPT or G 1½) must be available in the process.
5�2�1�1 Installation with self-sealing connection thread (R 1½ and 1½ NPT)
5
Installation with self-sealing connection thread
Summary of Contents for Solimotion FTR20
Page 58: ...Solimotion FTR20 58 Endress Hauser ...
Page 60: ...www addresses endress com ...