Mounting
Liquiline System CA80TN
18
Hauser
624 (24.57)
417 (16.42)
530 (20.87)
297 (11.70)
A
A
A
A
A0036783
15
Foundation plan
A
Fasteners (4 x M10)
--- Dimensions of Liquiline System CA80
A0036785
16
Securing the base
1. Screw the base to the ground.
2. With 2 people, lift the analyzer and fit it on the base. Use the recessed grips.
3. Secure the base to the analyzer using the 6 screws supplied.
5.2.3
Mounting the Y strainer (optional)
The Y strainer is designed to directly tap particle-laden samples from pipes. This makes it
possible to determine the total nitrogen. Here, it is necessary to include particles up to a
defined size in the measurement.
Mounting materials are not supplied.
‣
Provide the mounting materials onsite.
Summary of Contents for Liquiline System CA80TN
Page 2: ......
Page 162: ...www addresses endress com 71593684 71593684 ...