Maintenance and care
multi EA 5100
126
C module 5100
Maintenance inter-
val
Maintenance task
Weekly
Clean the module from the outside
Check hoses for cracks, replace as necessary
Check hose connections for tight fit
TOC module 5100
Maintenance inter-
val
Maintenance task
Daily
Check gas flow
Check copper wool in the halogen trap for discoloration
Regenerate the TIC reactor
Weekly
Clean the module from the outside
Check hoses for cracks, replace as necessary
Check hose connections for tight fit
Quarterly
Check the TOC combustion tube for cracks and damage
Check the TIC reactor for cracks and damage.
Check the condensation coil for cracks and damage
Check the condensate pump for leaks
Check the dosing syringe for leaks
Every six months
Replace water traps, earlier if necessary
Annually
Replace catalyst in the TOC combustion tube, earlier if in-
structed in the software
Clean the TOC combustion tube
Clean the condensation coil
Replace the pump hose of the condensate pump
Clean the dosing syringe
As necessary
Replace the filling of the halogen trap as soon as half of the
copper wool has changed color
Replace the septum on the TOC combustion tube if the system
has any leaks
Replace the septum on the TIC reactor if the system has any
leaks
14.2 Maintenance of the multi-purpose combustion tube
CAUTION
Risk of injury from falling components
The user can be injured if the combustion tube falls down during maintenance.
¡
Exercise extreme caution when performing maintenance on the combustion tube.