1.2.2
T-200 transducer assembly
Figure 1-1: T-200 transducer assembly
A. Meter housing
B. Captive screw
C. T-200 transducer stalk assembly
D. Cable nut
E. Chordset
Procedure
1. Leave T-200 transducers installed on the 3410 Series Gas Ultrasonic Meter while the
line is pressurized.
2. Run the field hydrostatic test.
1.3
Routine maintenance
Routine maintenance operations requires adherence to all applicable regulations and laws
and safety training for personnel to perform the maintenance operations. Review your
organization's best practices procedures before performing routine maintenance.
Maintenance
Maintenance and Troubleshooting Manual
April 2022
00809-0600-3104
8
Emerson.com/Rosemount