Table 2-3: Meter Monitor maintenance
(continued)
MeterLink utility
Diagnostics
Action(s)
•
Analog outputs
•
Run Analog Outputs test
•
Verify outputs are within
4mA - 20mA range
—
0% = 4mA
—
25% = 8mA
—
50% = 12mA
—
75% = 16mA
—
100% = 20mA
•
Digital outputs
•
Run the Digital Outputs test
•
Digital Output Content is in
relation to frequency
validity and flow direction
configuration and polarity.
Meter Electronics
•
Acquisition Module
communications error
•
Check firmware revision
and upgrade if necessary
using MeterLink
Tools
→
Program Download
.
•
Check for 5V between pins
1 and 2 on I.S. Barrier cable.
Troubleshooting
Maintenance and Troubleshooting Manual
April 2022
00809-0600-3104
32
Emerson.com/Rosemount