Possible causes and recommended actions for electrical shorts
(continued)
Table 10-8:
Possible cause
Recommended action
Internally shorted feedthrough
Contact Micro Motion.
Faulty cable
Replace the cable.
Improper wire termination
Verify wire terminations inside the sensor junction box. The
Micro Motion document titled
9‐Wire Flowmeter Cable Prep‐
aration and Installation Guide
may offer some assistance.
10.12.1
Check the sensor coils
Checking the sensor coils can identify electrical shorts.
Restriction
This procedure applies only to 9-wire remote-mount transmitters and remote transmitters with
remote core processors.
Procedure
1.
Disconnect power to the transmitter.
CAUTION!
If the transmitter is in a hazardous area, wait 5 minutes before continuing.
2.
Unplug the terminal blocks from the terminal board on the core processor.
3.
Using a digital multimeter (DMM), check the pickoff coils by placing the DMM leads
on the unplugged terminal blocks for each terminal pair. See
the coils. Record the values.
Coils and test terminal pairs
Table 10-9:
Coil
Sensor model
Terminal colors
Drive coil
All
Brown to red
Left pickoff coil (LPO)
All
Green to white
Right pickoff coil (RPO)
All
Blue to gray
Resistance temperature detector (RTD) All
Yellow to violet
Lead length compensator (LLC)
All except T-Series and CMF400
(see note)
Yellow to orange
Troubleshooting
Configuration and Use Manual
83
Summary of Contents for Micro Motion LNG Series
Page 1: ...Configuration and Use Manual MMI 20032809 Rev AA February 2017 Micro Motion LNG Series Meters ...
Page 6: ...Contents iv Micro Motion LNG Series Meters ...
Page 8: ...Getting Started 2 Micro Motion LNG Series Meters ...
Page 12: ...Before you begin 6 Micro Motion LNG Series Meters ...
Page 18: ...Quick start 12 Micro Motion LNG Series Meters ...
Page 20: ...Configuration and commissioning 14 Micro Motion LNG Series Meters ...
Page 50: ...Configure device options and preferences 44 Micro Motion LNG Series Meters ...
Page 56: ...Integrate the meter with the control system 50 Micro Motion LNG Series Meters ...
Page 58: ...Complete the configuration 52 Micro Motion LNG Series Meters ...
Page 60: ...Operations maintenance and troubleshooting 54 Micro Motion LNG Series Meters ...
Page 74: ...Measurement support 68 Micro Motion LNG Series Meters ...
Page 94: ...Using ProLink III with the transmitter 88 Micro Motion LNG Series Meters ...
Page 98: ...Default values and ranges 92 Micro Motion LNG Series Meters ...
Page 99: ...Default values and ranges Configuration and Use Manual 93 ...