•
I
-
3
EEVs
11-11
sensor default locations
9-16
sensor failures
11-15
–
11-16
sensors
default installation locations
9-16
setting up individual CC-100s
11-16
specifying the number of
10-2
,
10-16
stand-alone mode
11-15
superheat control
11-11
temperature control
11-11
temperature probes
installing
9-16
valve cable
9-17
valves
11-11
EEPRs
11-12
EEVs
11-11
liquid pulse
11-11
liquid stepper
11-11
pulse
11-11
stepper
11-11
suction stepper
11-12
walk-in freezer control
11-15
wash mode.
See Clean Mode.
11-14
CC-100H.
See Case Controllers.
CC-100LS.
See Case Controllers.
CC-100P.
See Case Controllers.
CCB Case Controllers
9-18
Checking Boards Online
10-15
,
12-11
Checking Status Screens
12-11
Clean Mode
11-14
,
12-9
initiating
12-9
Clean Out
10-1
Clean Switches
11-7
Cold Reset
performing a
10-1
Cold Reset Button
10-1
COM Port Setup
5-1
Commissioning
10-16
Commissioning CC-100s
10-16
how commissioning works
10-17
Commissioning MODBUS
10-17
Compressors
troubleshooting
F-3
Condensers
air cooled
11-3
strategy
11-3
bypassing fan stages
12-10
evaporative
11-4
fail-safe dip switch setup
11-5
fan control
11-4
single-speed
11-4
two-speed
11-4
variable-speed
11-4
fast recovery
11-4
hardware overview
11-4
input types
11-5
output wiring
11-5
overriding compressor stages
12-10
problems with
F-5
split mode
11-4
Temperature Differential Strategy
11-3
Control Keys
12-8
Control Techniques VSD
6-6
Convenience Store Controller
1-3
Cool cut in/cut out setpoints
11-53
Copeland CoreSense E2 Alarms
C-15
Copeland Digital Discus Compressor
11-1
,
11-2
Copeland ISD Compressors
6-7
CPU
2-2
Creating
10-14
CS-100
11-10
CS-100.
See Case Controllers, CS-100
CT Drives
6-6
CUB
2-6
,
11-30
CX Home Screen
12-2
-D-
Daisy Chains
diagram of
6-2
Date and Time
12-12
Date Setup
10-9
Daylight Savings Dates
10-10
Defrost
defrost cycle
11-6
,
11-12
demand
11-13
fail-safe time
11-13
drip time.
See Defrost, run-off time.
electric
11-13
emergency
11-13
initiating
12-9
hot gas
11-12
in case controlled circuits
11-12
inhibiting, using demand sensors
11-13
Summary of Contents for E2
Page 2: ......
Page 4: ......
Page 16: ......
Page 24: ......
Page 48: ......
Page 55: ......
Page 56: ......
Page 72: ...6 16 E2 RX BX CX I O Manual 026 1614 Rev 4 5 JAN 2013 ...
Page 75: ...BACnet The RS485 Network and Hardware Setup 6 19 ...
Page 79: ...BACnet The RS485 Network and Hardware Setup 6 23 ...
Page 80: ...6 24 E2 RX BX CX I O Manual 026 1614 Rev 4 5 JAN 2013 ...
Page 81: ......
Page 82: ......
Page 92: ...8 6 E2 RX BX CX I O Manual 026 1614 Rev 4 5 JAN 2013 ...
Page 94: ...8 8 E2 RX BX CX I O Manual 026 1614 Rev 4 5 JAN 2013 ...
Page 114: ......
Page 144: ......
Page 203: ......
Page 204: ......
Page 226: ......
Page 253: ......
Page 254: ......
Page 257: ......
Page 258: ......
Page 267: ......
Page 268: ......
Page 270: ......
Page 282: ......