25
Scout 320 REV 3:2018
Attachment of the synchronization rod to the MAVD is to one of 3 threaded
holes. The all threaded rod is to be attached to this area. Point A
Once the telescoping nose is attached and aligned to the bar feeder,
adjustment to the MAVD is completed by the vertical plate at point B.
The ball joint tat ships with the machine may or may not be
used during the installation. Example of Synch rod assembled.
A
B