11.2.4 Self Test Status
The FP-5000 Feeder Protection Relay performs a self-test of the
microprocessor and supporting hardware such as memory and analog
circuitry. To view the results, select the Status/Control menu then
Status/Self Test Status. See the troubleshooting Section 12.1.3
“Self Test Status Indication” for a detailed description of each function.
11.2.5 Test Menu
Tests performed under the test menu allow the user to perform fault
simulations and control the state of relays 1 – 6. To access the test
menu functions, lift the protective cover labeled “Set” and “Test”,
press the “
Test
” button, and enter the unit’s password.
11.2.5.1 Fault Simulation
The FP-5000 has a self-test function, which allows voltages and
currents, both rms and phasor values, to be applied to the internal
firmware in a simulation process. The unit can be placed in a trip or
no trip mode to verify coordination trip times, demonstrate tripping
and indicate trip times under user-selected overload conditions. The
various functions that can be checked are:
• Overvoltage
• Undervoltage
• Unbalanced voltage
• Instantaneous overcurrent
• Inverse time overcurrent
• Unbalance current protection
Once the desired protection settings have been programmed, the
“Test” function can be used as follows:
• If a non-trip test is desired, the user must disarm tripping. The first
step is to enable the “Disarm Control” setting in the “
Set
” mode
“System Config” setting menu. Then, the “Arm/Disarm Trip” selection
can be made from the test menu.
• Press the “
Test
” button. Enter the unit’s password, then select
“Fault Simulation” under the test menu.
• Enter the phasor values of voltages (line-to-neutral for a Wye con-
nection or line-to-line for a Delta connection) and phasor currents.
Refer to the FP-5000 protection settings to determine appropriate
values for testing. Select the “Fault V&I
Phasors” menu item and
select the VA Phasor. Input the desired VA magnitude from 0 to 150V
and the angle. Press “
Enter
” and then press “
Previous.
” Repeat these
steps to set the remaining voltages and currents to the desired test
values, then press “
Previous
” to return to the “Fault Simulation” menu.
• Using the down arrow key, select “Max Time (s):”. Enter the
maximum test time, in seconds (up to 600 seconds = 10 minutes),
that the simulation will be allowed to run without a trip condition.
• Scroll down to the “Start Simulation!” menu selection. Press
“
Enter
” to begin the simulation.
• Once the simulation is started and before a trip occurs, the “
Monitor
”
screens can be used to view the measured values of the simulated
voltages and currents.
• When a trip occurs, the front panel “
Log
” screens can be used to
view the cause of the trip and the voltages, currents and internal
flags at the time of trip.
• The time to trip can be viewed by re-entering the front panel “
Test
”
function Fault Simulation/Stop Simulation, which includes a screen
showing the Simulation status, including the elapsed time in cycles.
The power and energy calculations continue to be based on the
measured current and voltage inputs, not the simulation values.
The fault simulation is aborted and normal protection is resumed if
measured currents go above 0.1 per unit.
11.2.5.2 Operate Relays
Note that the Healthy Relay cannot be overwritten. To test the
Healthy Relay, cycle power and the contacts should follow. To test
relays 1 – 6, lift the protective cover labeled “
Set
” and “
Test.
” Press
the “
Test
” button. Enter the unit’s password, then scroll down to
“Operate Relays” using the single arrow down key. The following
procedure will test relay 3 in this example. Scroll down using the
single arrow key to “Operate Rly3” and press “
Enter
”, then “
Enter
”
once again to confirm. With an ohmmeter measure between pins
113 and 114 of connector TB1 to verify that Relay 3 is closed. The
resistance should be close to zero ohms. Now press the “
Previous
”
button to return to the test menu. Scroll down to “Reset Relays” and
press “
Enter.
” Scroll down using the single down arrow key to
“Reset Rly3.” Press “
Enter
” and “
Enter
” again to confirm. Measure
between pins 113 and 114 of connector TB1 again. The ohmmeter
should read a high resistance or O.L. for an open circuit. This
exercise can be performed on all relays listed in the “Operate
Relays” menu.
Note:
Trip 1 & 2 relays have approximately 44K across the open
contacts as part of the monitor circuit.
11.3 Cleaning Instructions
Never clean the FP-5000 with the system or FP-5000 power
energized. Clean only with a dry, clean cloth. Do not use water or
solvents of any kind.
11.4 Trip Battery Check
The battery backed trip circuit latch is sourced by a user-accessible
disc/button type battery located under the bottom right hand cover
shared with the PowerPort RS-232 interface. Testing is accom-
plished by pushing the test button to the left of the battery holder
with or without the FP-5000 powered. If the green LED indicator
above the battery holder does not light then the battery has expired
or has been installed upside down. Proper orientation is depicted on
the front of the battery cover door. The battery can easily be replaced
with a 2032 (20X3.2 mm) 200 mAhr, 3.0V lithium button cell.
Installing the battery into a powered FP-5000 is normal acceptable
maintenance and will insure proper trip LED status. When power is
removed the battery maintains the trip status latch and drives the
appropriate LED. This will occur even with the inner case removed
from the outer chassis. A fresh battery will last a minimum of
72 hours.
If the battery is installed with the FP-5000 power off (for at least ten
seconds) then all three trip indicator LEDs, phase, ground, or other
trip, in the center of the user interface will flash at 1 Hz regardless of
the actual trip status. This may be a useful test if the integrity of the
LED indicators is in question. Restore power to the FP-5000 and the
proper trip status should be restored.
11.5 Power-up LED Indicator Status
Upon power-up of the FP-5000, all 13 LEDs on the user interface
overlay and the four communication board LEDs viewed through
holes at the top of TB3 will light for ~ 1 second. If an LED fails to
light, this indicates there is an internal failure of the LED or related
circuitry, and the inner chassis is suspect and should be replaced or
returned for service. The Trip Battery test LED is a separate circuit
and does not light on power up, only when the pushbutton is pushed.
Summary of Contents for Cutler-Hammer FP-5000
Page 1: ...IL17569 Effective June 2001 Instructions for FP 5000 Protective Relay...
Page 7: ...IL17569 Table of Contents 6 Effective June 2001 This page left blank intentionally...
Page 13: ...IL17569 Page 2 2 Effective June 2001 Figure 2 2 FP 5000 Simple Wye Connected Application...
Page 14: ...Page 2 3 IL17569 Effective June 2001 Figure 2 3 FP 5000 Simple Open Delta Application...
Page 19: ...IL17569 Page 2 8 Effective June 2001 This page left blank intentionally...
Page 25: ...IL17569 Page 3 6 Effective June 2001 This page left blank intentionally...
Page 98: ...IL17569 Page 5 50 Effective June 2001 This page left blank intentionally...
Page 108: ...IL17569 Page 6 10 Effective June 2001 Figure 6 10 Common Ct Wiring Configurations...
Page 141: ...IL17569 Page 11 4 Effective June 2001 This page left blank intentionally...
Page 165: ...IL17569 Page Appendix 6 Effective June 2001 Figure 13 2 ANSI Very Inverse...
Page 166: ...Page Appendix 7 IL17569 Effective June 2001 Figure 13 3 ANSI Extremely Inverse...
Page 167: ...IL17569 Page Appendix 8 Effective June 2001 Figure 13 4 IEC A Figure 13 4 IEC A...
Page 168: ...Page Appendix 9 IL17569 Effective June 2001 Figure 13 5 IEC B...
Page 169: ...IL17569 Page Appendix 10 Effective June 2001 Figure 13 6 IEC C...
Page 170: ...Page Appendix 11 IL17569 Effective June 2001 Figure 13 7 IEC...
Page 171: ...IL17569 Page Appendix 12 Effective June 2001 Figure 13 8 ANSI...
Page 172: ...Page Appendix 13 IL17569 Effective June 2001 Figure 13 9 Thermal...
Page 173: ...IL17569 Page Appendix 14 Effective June 2001 Figure 13 10 Phase I4 t...
Page 174: ...Page Appendix 15 IL17569 Effective June 2001 Figure 13 11 Phase I2 t...
Page 175: ...IL17569 Page Appendix 16 Effective June 2001 Figure 13 12 Phase It...
Page 176: ...Page Appendix 17 IL17569 Effective June 2001 Figure 13 13 Phase 12 I4 t...
Page 177: ...IL17569 Page Appendix 18 Effective June 2001 Figure 13 14 Phase I2 t...
Page 178: ...Page Appendix 19 IL17569 Effective June 2001 Figure 13 15 Ground IT...
Page 180: ...Page Appendix 21 IL17569 Effective June 2001 This page left blank intentionally...
Page 187: ...Publication No IL17569 June 2001 Pittsburgh Pennsylvania U S A...