8.6
NOSE BALLAST INSTALLATION AND
REMOVAL
8.6.1
Determine amount of ballast to be
added or removed and moment arm. Refer to
Figure 8-3 for nose ballast station and butt line
(B.L.) moment arms. Add or remove nose ballast
weight as symmetrically as possible.
8.6.2
If ballast weight must be added, refer to
Figure 8-3 to determine allowable number of
ballast plates in each location. Inspect nose
compartment to determine where additional ballast
plates may be added.
8.6.3
If ballast weight must be removed,
inspect nose compartment to determine locations
where ballast weight plates may be removed.
8.7
TAIL SKID BALLAST INSTALLATION
AND REMOVAL
8.7.1
Installation of equipment at forward
stations and nose of helicopter may require
addition of ballast (2 and 3, Figure 8-4) and/or
inside tail skid (5) to aft section of tailboom (6).
8.7.2
After installation of equipment, a weight
and balance check shall be accomplished. Ballast
required to correctly locate center of gravity should
be installed on or in tail skid (5).
8.7.3
Ballast may be added to a maximum of
50 lbs (22.68 kg) on and in tail skid. Ballast
weights should be installed in a combination to
provide amount required by weight and balance
check.
NOTE
Ballast weights (2 and 3) shall be installed in
combination with washers (1) and clamps (4) on
tail skid (Figure 8-4).
8.7.4
Ballast, when required, should be
installed on that portion of tail skid located inside
tailboom (Figure 8-4) or inside tail skid.
NOTE
When ballast is installed inside tail skid, tail skid
shall be filled completely full, approximately 15 lbs
(6.8 kg).
8.7.5
Install ballast inside tail skid as follows:
8.7.5.1 Remove weight and record tail skid
weight.
8.7.5.2
Remove phenolic plug from forward end
of tail skid.
8.7.5.3
Completely fill tail skid with lead shot.
8.7.5.4 Install phenolic plug in forward end of
tail skid and reweigh tail skid. Determine amount
of ballast added (subtract tail skid empty weight
from filled tail skid weight). Stencil forward end of
tail skid, and inboard side of each tail skid access
panel with actual weight of ballast added.
8.7.5.5
Install tail skid.
8.7.5.6
Add additional ballast, as required, not
to exceed 50 pounds (22.68 kg) total ballast.
Summary of Contents for ICA-D212-725
Page 2: ......
Page 19: ......
Page 47: ......
Page 55: ......
Page 71: ......
Page 73: ......
Page 75: ......
Page 95: ......
Page 121: ......
Page 137: ......
Page 149: ......
Page 249: ......
Page 251: ......
Page 325: ......
Page 327: ......
Page 473: ......
Page 475: ......
Page 531: ......
Page 581: ......
Page 707: ......
Page 729: ......