ICA-D212-725 (05)
Page 25 of 25
CHAPTER 05 – INSPECTION AND COMPONENT OVERHAUL SCHEDULE (05-00-00)
COPYRIGHT
2007 BY DART AEROSPACE LTD.
THIS DOCUMENT IS PRIVATE AND CONFIDENTIAL AND IS SUPPLIED ON THE EXPRESS CONDITION THAT IT IS NOT TO BE USED FOR ANY PURPOSE OR COPIED OR COMMUNICATED TO
ANY OTHER PERSON WITHOUT WRITTEN PERMISSION FROM DART AEROSPACE LTD.
Revision:
4
Date: 11.06.01
5.16
COMPONENT OVERHAUL SCHEDULE
5.16.1
Refer to the following Honeywell Service Bulletins for limitations on the engine/engine
components:
T5313B/17-0001
Time Between Overhaul/Time Between Inspection
T5313B/17-0020 Life
Limits
5.16.2
The component overhaul schedule noted in Chapter 05 of the BHT-212-MM applies to this
helicopter. In addition the component overhauls listed in Table 5-1 of this chapter supplement those of
the helicopter manufacturer.
Table 5-1 Component Overhaul Schedule
NOMENCLATURE PART
NUMBER
OVERHAUL INTERVAL
HOURS
Oil Cooler Fan
204-062-540-001 1000
Summary of Contents for ICA-D212-725
Page 2: ......
Page 19: ......
Page 47: ......
Page 55: ......
Page 71: ......
Page 73: ......
Page 75: ......
Page 95: ......
Page 121: ......
Page 137: ......
Page 149: ......
Page 249: ......
Page 251: ......
Page 325: ......
Page 327: ......
Page 473: ......
Page 475: ......
Page 531: ......
Page 581: ......
Page 707: ......
Page 729: ......