Operation
ICA250i-IN2EN1.pdf
2012-12-19
Switching off
1
22
9
Fig. Instrument panel
1. Starter switch
9. Instrument guard
22. Panel for warning lamps
Check instruments and warning lamps to see if any
faults are indicated. Switch off all lights and other
electrical functions.
Turn the starter switch (1) to the left to switched off
position 1. At the end of the shift, lower the instrument
cover (22) and lock it.
Parking
Master switch
1
Fig. Engine compartment
1. Master switch
Before leaving the roller for the day, switch the master
switch (1) to the disconnected position and remove the
key.
This will prevent battery discharging and will also
make it difficult for unauthorized persons to start and
operate the machine. Also lock the engine hood.
37
Summary of Contents for CA250 i
Page 2: ......
Page 18: ...Special instructions ICA250i IN2EN1 pdf 2012 12 19 10...
Page 36: ...Machine description ICA250i IN2EN1 pdf 2012 12 19 28...
Page 56: ...Operating instructions Summary ICA250i IN2EN1 pdf 2012 12 19 48...
Page 58: ...Preventive maintenance ICA250i IN2EN1 pdf 2012 12 19 50...
Page 80: ...Maintenance 250h ICA250i IN2EN1 pdf 2012 12 19 72...
Page 92: ......
Page 93: ......