Working basis
Service Instructions 878-M PREMIUM - 03.0 - 10/2019
13
3
Working basis
3.1
Order of the settings
Order
The setting positions for the machine are interdependent.
Always comply with the order of individual setting steps as specified.
It is absolutely essential that you follow all notices regarding prerequisites
and subsequent settings that are marked with
in the margin.
3.2
Laying the cable guide
Ensure that all cables are laid in the machine such that the function of the
moving parts is not hampered.
1.
Lay any excess cabling neatly in proper cable snakes.
2.
Bind the cable loops together with cable ties.
Important
Tie the loops wherever possible to fixed parts.
The cables must be secured firmly.
3.
Cut off any overlapping cable ties.
NOTICE
Property damage may occur!
Risk of machine damage due to incorrect order.
It is essential to follow the working order specified in these
instructions.
NOTICE
Property damage may occur!
Excess cables can impair the functioning of moving machine parts.
This impairs the sewing function and can result in damage.
Lay excess cable as described above.
Summary of Contents for 878-M PREMIUM
Page 1: ...878 M PREMIUM Service Instructions...
Page 10: ...About these instructions 8 Service Instructions 878 M PREMIUM 03 0 10 2019...
Page 66: ...Integrated motor 64 Service Instructions 878 M PREMIUM 03 0 10 2019...
Page 114: ...Maintenance 112 Service Instructions 878 M PREMIUM 03 0 10 2019...
Page 116: ...Decommissioning 114 Service Instructions 878 M PREMIUM 03 0 10 2019...
Page 118: ...Disposal 116 Service Instructions 878 M PREMIUM 03 0 10 2019...
Page 126: ...Technical data 124 Service Instructions 878 M PREMIUM 03 0 10 2019...
Page 127: ...Appendix Service Instructions 878 M PREMIUM 03 0 10 2019 125 23 Appendix Wiring diagram...
Page 128: ...Appendix 126 Service Instructions 878 M PREMIUM 03 0 10 2019...
Page 129: ......