6.4
Painting
Personnel:
Operator
+ additional qualification explosion pro-
tection
+ Additional qualification high pressure
Protective equipment:
Protective workwear
Respiratory protection device
Face protection
Use ear protection
Protective gloves
Safety boots
Fig. 13: Painting process
1. Tilt down retainer lever (1) by 90°.
ð
The spray gun is unlocked.
2. Drive the trigger (2) up to the first center
of pressure.
ð
The pilot air starts.
3. Drive the trigger (2) completely.
ð
The high pressure spray medium
starts.
4. Guide the spray gun at a 90° angle at a
distance of 25 to max. 30cm from the sur-
face to be painted.
The distance can vary for effect
coatings.
5. After completing the coating process, tilt
the retainer lever down by 90°.
ð
The spray gun is locked.
To avoid formation of drops after
completing the painting process,
leave the pilot air valve open for
another 1 - 2 seconds.
Operation
02/2020
EcoGun 2100 - MSG00004EN
16/52