![DÖRR EcoGun 2100 Operation Manual Download Page 24](http://html.mh-extra.com/html/dorr/ecogun-2100/ecogun-2100_operation-manual_2523764024.webp)
3. Remove nozzle
4. Purge the spray gun quickly without the
nozzle
Install large filter
Personnel:
Operator
+ additional qualification explosion pro-
tection
+ Additional qualification high pressure
Protective equipment:
Face protection
Protective workwear
Protective gloves
Fig. 18: Install large filter
1. Insert filter (2) into the paint pipe (1).
ð
The filter projects out of the paint pipe
by about 4mm. The filter is installed.
2. Insert spring (3).
3. Insert sleeve (4).
4. Screw material connection (5) onto the
paint pipe (1) using a SW 17mm spanner.
Simultaneously, counter-support paint
pipe (1) using an SW 13mm spanner.
5. Remove nozzle
6. Purge the spray gun quickly without the
nozzle
8.3.3 Remove the needle
Personnel:
Operator
+ additional qualification explosion pro-
tection
+ Additional qualification high pressure
Protective equipment:
Face protection
Protective workwear
Protective gloves
Fig. 19: Remove needle
2. Unscrew plug (1).
3. Pull out needle (2) with spring (6) and
pressure disc (5) on rear part of the
needle (4).
ð
Removal of needle is complete.
Maintenance
02/2020
EcoGun 2100 - MSG00004EN
24/52