2. Unscrew material connection (4) on the
key surface using a SW 17mm spanner.
Simultaneously support the upper paint
pipe (1) using a SW 11mm spanner.
3. Thread out filter (2) downwards from the
bottom paint pipe (3).
ð
The filter is removed.
Remove the large filter
Personnel:
Operator
+ additional qualification explosion pro-
tection
+ Additional qualification high pressure
Protective equipment:
Face protection
Protective workwear
Protective gloves
Fig. 16: Remove the large filter
2. Unscrew material connection (3) on the
key surface using a SW 17mm spanner.
Simultaneously, counter-support paint
pipe (1) using an SW 13mm spanner.
3. Remove the sleeve (5).
4. Remove the spring (4).
5. Thread out the filter (2) downwards from
the paint pipe.
ð
The filter is removed.
8.3.2 Install filter
Install small filter
Personnel:
Operator
+ additional qualification explosion pro-
tection
+ Additional qualification high pressure
Protective equipment:
Face protection
Protective workwear
Protective gloves
Fig. 17: Install small filter
1. Thread-in filter (1) into the lower paint
pipe (2).
ð
The filter projects out of the paint pipe
by about 18mm. The filter is installed.
2. Screw material connection (4) on the
bottom paint pipe (2) using an SW 17mm
spanner.
Simultaneously support the upper paint
pipe (3) using a SW 11mm spanner.
Maintenance
02/2020
EcoGun 2100 - MSG00004EN
23/52