UltiMate 3000 Series: Flow Managers and Column Thermostats
Page
16
Operating Instructions
9.
Pull the column back (
→
Fig. 8) and install the preassembled fitting with the column
to the appropriate port on the switching valve. Make certain that the column does not
extend the sleeve when installing it into the port
Fig. 8: Pulling the column back
10.
Tighten the nut finger-tight. To avoid the formation of dead volumes, make certain
that the column inlet enters all the way to the bottom of the valve port (e.g. push the
column into the valve).
11.
Tighten the nut additional 1/4 turn past finger-tight.
12.
Start flow delivery and check for leakage. In case of any leakage, stop flow delivery
and remove the fitting. Repeat steps 8 till 11.
Tip:
If you cannot use finger-tight fittings due to limited space, you may use the
long hex style nuts, instead (
→
Fig. 9; part no. 6721.0017; the nuts are
included in the application kits for the biocompatible UltiMate 3000 system,
also). Follow the above steps and then connect the hex nut to the
appropriate port on the switching valve. Tighten the nut with a ¼" wrench.
Fig. 9: Long hex style nut
Summary of Contents for UltiMate FLM-3100
Page 2: ...UltiMate 3000 Series Flow Managers and Column Thermostats Operating Instructions...
Page 4: ...UltiMate 3000 Series Flow Managers and Column Thermostats Page II Operating Instructions...
Page 30: ...UltiMate 3000 Series Flow Managers and Column Thermostats Page 24 Operating Instructions...
Page 46: ...UltiMate 3000 Series Flow Managers and Column Thermostats Page 40 Operating Instructions...
Page 98: ...UltiMate 3000 Series Flow Managers and Column Thermostats Page 92 Operating Instructions...