73
26.2.12
Check the anti-corrosive/paint coat
Check all the painted steel constructions, in particular the load-bearing structures
and welded seams for any damage in the paint coat. Grind off any rust and repaint
as necessary.
Check the box-type structures with anti-corrosion coating and renew the treatment if
necessary, using e.g. Tectyl 210R anti-corrosive agent.
26.2.13
Test run in accordance with the loading instructions
See the relevant test run instructions in point: Test loading instructions for regular
inspection
Check the structures after the test-run.
26.2.14
Draw up a protocol of the service
Save your own copy and give the other copy to the customer.
Summary of Contents for DINO 185XTS
Page 2: ...2 ...
Page 3: ...3 ORIGINAL OPERATING INSTRUCTIONS VALID FROM SERIAL NUMBER 540016 ...
Page 8: ...8 2 REACH DIAGRAM ...
Page 9: ...9 3 DIMENSION DRAWING ...
Page 45: ...45 17 NOTES ...
Page 49: ...49 Obscured greasing nipples 19 LUBRICATION INSTRUCTIONS ...
Page 75: ...75 NOTES ...
Page 77: ...77 28 1 1 Sample of inspection protocol for the access platform Continuous ...
Page 78: ...78 ...
Page 95: ...95 30 2 DINO 185 XTC ELECTRIC COMPONENTS 540003 30 3 ...
Page 96: ...96 ...
Page 97: ...97 ELECTRIC DIAGRAMS 540003 ...
Page 98: ...98 ...
Page 99: ...99 ...
Page 100: ...100 ...
Page 101: ...101 ...
Page 102: ...102 ...
Page 103: ...103 ...
Page 104: ...104 ...
Page 105: ...105 ...
Page 106: ...106 ...
Page 107: ...107 ...
Page 108: ...108 ...
Page 109: ...109 ...
Page 110: ...110 ...
Page 111: ...111 ...
Page 112: ...112 ...
Page 113: ...113 ...
Page 114: ...114 ...
Page 115: ...115 ...
Page 116: ...116 ...
Page 117: ...117 30 4 HYDRAULIC COMPONENTS 540016 ...
Page 118: ...118 30 5 HYDRAULIC DIAGRAMS 540016 ...
Page 119: ...119 ...
Page 120: ...120 ...
Page 121: ...121 31 NOTES ...