4
TABLE OF CONTENTS
OPERATION AND SAFETY ................................................................................................ 7
1.
EU
DECLARATION
OF
CONFORMITY ..................................................................... 7
2.
REACH
DIAGRAM ..................................................................................................... 8
3.
DIMENSION
DRAWING ............................................................................................ 9
4.
TECHNICAL
SPECIFICATION .................................................................................10
4.1
Example of the machine’s nameplate ................................................................10
4.2
General description of the machine ...................................................................11
4.3
Description of the machine’s intended use ........................................................12
5.
GENERAL
SAFETY
REGULATIONS ........................................................................12
6.
INSPECTIONS ..........................................................................................................16
7.
DAILY
INSPECTION
(START-UP
INSPECTION) .....................................................17
8.
WORKSITE
INSPECTION ........................................................................................19
9.
OPERATION
OF
THE
SAFETY
DEVICES ................................................................20
9.1
Lifting the boom/ articulated arms (RK3) ...........................................................20
9.2
Boom extensions retracted (RK8) ......................................................................20
9.3
Emergency stop buttons (S1 and S4) ................................................................20
9.4
Platform load control (MRV)...............................................................................21
9.5
inclination sensors RK30a and RK30b...............................................................23
10.
OPERATING
CONTROLS .....................................................................................24
10.1
LCB – CONTROLS IN THE CHASSIS PANEL – XTS ......................................24
10.2
UCB – OPERATING CONTROLS ON THE PLATFORM – XTS .......................25
11.
MEASURES
TO
BE
TAKEN
IN
CASE
OF
EMERGENCY/AT
RISK
OF
LOSING
THE
STABILITY ...............................................................................................................27
12.
STARTING
UP ......................................................................................................28
12.1
Familiarise yourself with the machine and these instructions ............................28
12.2
Starting the engine .............................................................................................28
12.2.1
From the chassis control panel LCB ...........................................................28
12.2.2
From the platform control panel UCB .........................................................29
12.3
Transferring, driving and steering ......................................................................31
12.3.1
Driving to the front and to the rear ..............................................................31
12.3.2
Steering ......................................................................................................32
12.3.3
Using the differential lock ............................................................................32
12.4
Operating the boom ...........................................................................................32
12.4.1
Operating the boom from the platform control centre UCB .........................33
12.4.2
Operating the boom from the chassis control centre LCB ..........................35
12.5
Socket outlets on the platform. ..........................................................................36
12.6
General driving instructions ...............................................................................36
13.
EMERGENCY
DESCENT
SYSTEM ......................................................................38
13.1
General information ...........................................................................................38
13.2
Using the emergency descent system ...............................................................39
13.2.1
From the chassis control centre LCB ..........................................................39
13.2.2
Emergency descent from the platform control panel UCB ..........................39
13.3
Testing the operation of the emergency descent system ...................................39
14.
SPECIAL
INSTRUCTIONS
FOR
WINTER
USE ....................................................40
15.
MEASURES
TO
BE
TAKEN
AT
THE
END
OF
THE
WORKING
DAY .....................40
16.
PREPARING
THE
LIFT
FOR
TRANSPORT ..........................................................41
Summary of Contents for DINO 185XTS
Page 2: ...2 ...
Page 3: ...3 ORIGINAL OPERATING INSTRUCTIONS VALID FROM SERIAL NUMBER 540016 ...
Page 8: ...8 2 REACH DIAGRAM ...
Page 9: ...9 3 DIMENSION DRAWING ...
Page 45: ...45 17 NOTES ...
Page 49: ...49 Obscured greasing nipples 19 LUBRICATION INSTRUCTIONS ...
Page 75: ...75 NOTES ...
Page 77: ...77 28 1 1 Sample of inspection protocol for the access platform Continuous ...
Page 78: ...78 ...
Page 95: ...95 30 2 DINO 185 XTC ELECTRIC COMPONENTS 540003 30 3 ...
Page 96: ...96 ...
Page 97: ...97 ELECTRIC DIAGRAMS 540003 ...
Page 98: ...98 ...
Page 99: ...99 ...
Page 100: ...100 ...
Page 101: ...101 ...
Page 102: ...102 ...
Page 103: ...103 ...
Page 104: ...104 ...
Page 105: ...105 ...
Page 106: ...106 ...
Page 107: ...107 ...
Page 108: ...108 ...
Page 109: ...109 ...
Page 110: ...110 ...
Page 111: ...111 ...
Page 112: ...112 ...
Page 113: ...113 ...
Page 114: ...114 ...
Page 115: ...115 ...
Page 116: ...116 ...
Page 117: ...117 30 4 HYDRAULIC COMPONENTS 540016 ...
Page 118: ...118 30 5 HYDRAULIC DIAGRAMS 540016 ...
Page 119: ...119 ...
Page 120: ...120 ...
Page 121: ...121 31 NOTES ...