Single-Ended I/O Modules
5–18 UltraSCSI RAID Enclosure
Table 5–8 Installing Two Enclosure System Cables (Continued)
7. Align the Cable B connector with the right connector. Gently insert
the cable connector into module connector. Tighten both cable
connector thumb screws to fully seat the connector.
Install a wire tie through the holes on the cable support bracket and
around the cable. Tighten the wire tie.
CXO5855A
Cable B
8. Align
the
Cable B connector with the left connector on the other I/O
module. Gently insert the cable connector into module connector.
Tighten both cable connector thumb screws to fully seat the
connector.
9. Install a wire tie through the holes on the cable support bracket and
around the cable. Tighten the wire tie.
10. Align the I/O module with the Port 1 backplane connector in the
second expansion enclosure shroud. Gently insert the module and
fully seat it. Use a screwdriver to tighten the spring-loaded mounting
screws.
11. Repeat steps 1 through 10 for the remaining SCSI buses.
12. Turn the subsystem on (see Table 5–7) and verify that it is
functioning properly.
Summary of Contents for StorageWorks UltraSCSI DS-BA370 Series
Page 18: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 54: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 84: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 120: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 186: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...