Assembling an UltraSCSI RAID Enclosure
UltraSCSI RAID Enclosure B–3
Installing the Power System
The ac power controllers and shelf power supplies comprise the enclosure
power system.
CXO5800A
___________________ Caution ____________________
To prevent ESD (electrostatic discharge), do not touch the
connector.
________________________________________________
_____________________ Note ______________________
The ac power controller has no user serviceable components.
Should a power controller fail you must replace the entire
assembly.
________________________________________________
The sequence for installing the power system is as follows:
1. Install the ac power controllers (Table 6–5).
2. Install the shelf power supplies (Table 6–3).
Summary of Contents for StorageWorks UltraSCSI DS-BA370 Series
Page 18: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 54: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 84: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 120: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 186: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...