C h a p t e r 5 P a r a m e t e r s a n d F u n c t i o n s
5 - 2 7
_5
1AA
40427
Peak value of three -
phase reactive power
demand
0.000 – 99999.999
float
kVAR
4
R
1AB
40428
1AC
40429
Date of the three -
phase reactive power
demand
Year: 00–99
Month: 1–12
byte
Year,
Month
2
R
1AD
40430
Date: 1–31
word
Date
2
R
1AE
40431
Time of the three -
phase reactive power
demand
Hour: 00–23
Minute: 00–59
byte
Hour,
Minute
2
R
1AF
40432
Second: 00–59
word Second
2
R
1B0
40433
Present three - phase
apparent power
demand
0.000 – 99999.999
float
kVA
4
R
1B1
40434
1B2
40435
Last three - phase
apparent power
demand
0.000 – 99999.999
float
kVA
4
R
1B3
40436
1B4
40437
Predicted three -
phase apparent
power demand
0.000 – 99999.999
float
kVA
4
R
1B5
40438
1B6
40439
Peak value of three -
phase apparent
power demand
0.000 – 99999.999
float
kVA
4
R
1B7
40440
1B8
40441
Date of the three -
phase apparent
power demand
Year: 00–99
Month: 1–12
byte
Year,
Month
2
R
1B9
40442
Date: 1–31
word
Date
2
R
1BA
40443
Time of the three -
phase apparent
power demand
Hour: 00–23
Minute: 00–59
byte
Hour,
Minute
2
R
1BB
40444
Second: 00–59
word Second
2
R
1BC
40445
DUI (kW / Floor Area) 0.000 – 99999.999
float kW/m
2
4
R
Summary of Contents for DPM-C530
Page 2: ......
Page 3: ......
Page 10: ...DPM C530 Operation Manual 1 4 _1 _1 MEMO...
Page 16: ...DPM C530 Operation Manual 2 6 _2 2 4 Dimensions Front Unit mm Back Unit mm...
Page 35: ...5 1 5 Chapter 5 Parameters and Functions Table of Contents 5 1 Overview of Parameters 5 2...
Page 117: ...6 1 Chapter 6 Error Codes Table of Contents 6 1 Error Codes 6 2 6 2 Alarm Types 6 2 6...