Configuring the Software
74
To schedule a UPS self-test:
1
Click
Add Test
to open the
UPS
Self-Test window (see Figure 75).
Figure 75. UPS Self-Test Window
2
Select how often to perform the UPS self-test:
Once
or
Monthly
.
3
Select the start date and time for the UPS self-test.
NOTE:
The scheduled date and time cannot conflict with another scheduled UPS task.
4
Select the
Self-Test
option.
5
Select the UPS to test.