Check
List
Task
Topic
☐
2
Verify that the replacement DIMM is the
expected replacement module.
N/A
Perform mandatory software tasks to prepare the node for part replacement:
☐
3
Prepare the server for part replacement.
See "Gracefully shut down the node" in
the VxFlex Ready Node Field Replacement
Unit Software Guide
.
Return to this guide for instructions on replacing the system component:
☐
4
Remove the bezel.
See
166.
☐
5
Disconnect the power cords and I/O
cables.
See
Disconnect the power cords and I/O
☐
6
Extend the system from the cabinet.
See
Extend the system from the cabinet
on page 164.
☐
7
Remove the system cover.
See
on page
173.
☐
8
Remove the air shroud.
See
on page 169.
☐
9
Remove the faulty system memory
module.
See
78.
☐
10
Install the replacement system memory
module.
See
79.
☐
11
Install the air shroud.
See
Install the non-GPU air shroud
on page 171.
☐
12
Replace the system cover.
See
on page
173.
☐
13
Slide the system into the cabinet.
See
Slide the system into the cabinet
page 165.
☐
14
Connect the cable cords.
See
Connect the I/O cables and power
on page 164.
Perform mandatory software tasks to return the node to operation:
☐
15
Verify that the new memory reverts the
BIOS to a healthy state.
See "Replacing a DIMM memory module"
in the VxFlex Ready Node Field
Replacement Unit Software Guide
.
☐
16
Return the node to operation.
Remove a memory module
Before you begin
Follow all safety guidelines.
Hardware FRU procedures
78
VxFlex Ready Node R840
Hardware Field Replacement Unit and Service Manual