CAUTION
This FRU procedure requires you to perform mandatory software tasks in VxFlex
OS, as described in the
VxFlex Ready Node Field Replacement Unit Software Guide
.
You will be referred to these mandatory software tasks in the following checklist.
Check
List
Task
Topic
☐
1
Identify the faulty part.
System diagnostics and indicator
on page 203.
Perform mandatory software tasks to prepare the node for part replacement:
☐
2
Ensure that the iDRAC Service Module
(iSM) is installed and running on the
server.
See "iDRAC Service Module" in the
VxFlex Ready Node Field Replacement Unit
Software Guide
.
☐
3
Prepare the server for drive
replacement.
See "Replacing the NVMe drive" in the
VxFlex Ready Node Field Replacement Unit
Software Guide
. Perform all software-
related tasks listed up until you are
directed back to this guide to replace the
actual component.
CAUTION
Failure to perform all required
software-related tasks before
replacing a drive may result in loss of
data.
Return to this guide for instructions on replacing the system component:
☐
4
Remove the front bezel.
166.
☐
5
Remove the hard drive carrier.
69.
☐
6
Remove the NVMe drive.
Remove the drive from the drive
on page 70.
☐
7
Install the replacement NVMe drive.
Install the drive into the drive carrier
on page 71.
☐
8
Install the hard drive carrier
on page 72.
☐
9
Install the bezel.
on page 166.
Perform mandatory software tasks to return the node to operation:
☐
10
Return the node to operation.
See "Replacing the NVMe drive" in the
VxFlex Ready Node Field Replacement Unit
Software Guide
. Perform all required
software-related tasks listed after
replacing the hard drive, based on the
VxFlex OS configuration and the
operating system installed on the node.
Hardware FRU procedures
68
VxFlex Ready Node R840
Hardware Field Replacement Unit and Service Manual