Che
ck
List
Task
Topic
☐
5
Disconnect the power cords
and I/O cables.
Disconnect the power cords and I/O cables
on page
164.
☐
6
Extend the system from the
cabinet.
Extend the system from the cabinet
☐
7
Remove the system cover.
on page 173.
☐
8
Remove the NIC from the
expansion card riser.
Remove the expansion card from the expansion
☐
9
Install the NIC into the
expansion card riser.
Install the expansion card into the expansion card
on page 105.
☐
10 Install the system cover.
☐
11 Slide the system into the
cabinet.
Slide the system into the cabinet
on page 165.
☐
12 Connect the I/O cables and
power cords.
Connect the I/O cables and power cords
on page
164.
☐
13 Install the bezel.
Perform mandatory software tasks to return the node to operation:
☐
14 Verify the NIC in system
setup.
See "Network card replacement procedural checklist" in
the VxFlex Ready Node Field Replacement Unit Software
Guide
. Perform the relevant tasks, starting with "" until
you are directed back to this guide for Verify the NIC in
System Setup (BIOS)."
☐
15 Verify the new network card
in the server.
☐
16 Return the node to
operation.
Installing an optional NIC
Use the following procedure to install a network interface card when the first NIC is
installed in the network daughter card.
This procedure is for Data Domain scenarios when a BOSS card is not used.
Note
Before starting this FRU procedure, familiarize yourself with the topics in
information before performing a FRU procedure
CAUTION
This FRU procedure requires you to perform mandatory software tasks in VxFlex
OS, as described in the
VxFlex Ready Node Field Replacement Unit Software Guide
.
You will be referred to these mandatory software tasks in the following checklist.
Hardware FRU procedures
Installing an optional NIC
123