![background image](http://html1.mh-extra.com/html/daikin/split-sensira-r32/split-sensira-r32_service-manual_4171547138.webp)
3
|
Components
Service manual
138
(A)(F)TXF20~71A + FTXF20~25B + (A)(F)TXF20~42C + (A)(F)TXF20~42D +
(A)(F)TXF20~42E + (A)RXF20~71A + RXF20~60B + (A)RXF20~42C +
(A)RXF20~42D + (A)RXF20~42E
Split Sensira R32
ESIE18-12G – 2023.01
a
b
b
a
Reactor
b
Screw
5
To install the reactor
1
Install the reactor on the correct location on the switch box.
a
b
b
a
Reactor
b
Screw
2
Install the 2 screws that fix the reactor to the switch box.
3
Connect the Faston connectors to the reactor.
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
3.12 Swing flap motor
3.12.1 Checking procedures
To perform an electrical check of the swing flap motor
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
124].
1
Disconnect the swing flap motor connector from the indoor unit main PCB.