SiUS28-902_a
41
Test Operation
Part 6
Test Operation
1. Test Operation ......................................................................................42
1.1
Procedure and Outline ........................................................................... 42
1.2
Operation when Power is Turned On..................................................... 45
2. Outdoor Unit P.C.B. Layout ..................................................................46
3. Field Setting ..........................................................................................47
3.1
Field Setting from Remote Controller..................................................... 47
3.2
Field Setting from Outdoor Unit ............................................................. 55
3.3
Detail of Setting Mode............................................................................ 60
Summary of Contents for SkyAir FCQ18PVJU
Page 1: ...Split System Air Conditioners SkyAir Inverter R 410A Heat Pump 60Hz P Series SiUS28 902_a...
Page 44: ...Other Control SiUS28 902_a 37 Function...
Page 81: ...SiUS28 902_a Troubleshooting by Remote Controller Troubleshooting 74...
Page 185: ...SiUS28 902 Precautions for New Refrigerant R 410A Precautions for New Refrigerant R 410A 178...