![background image](http://html2.mh-extra.com/html/daikin/skyair-fcq18pvju/skyair-fcq18pvju_service-manual_4705640031.webp)
SiUS28-902_a
Special Control
Function
24
3.3
Defrosting Operation
The defrost operation is performed to solve frost on the outdoor unit heat exchanger when
heating, and the heating capacity is recovered.
[Conditions to start]
The defrost operation is started under the following conditions:
Outdoor heat exchanger heat transfer co-efficiency
Temperature of heat-exchange (Tb)
Timer (2 hours at the minimum)
In addition, outdoor heat-exchange co-efficiency is derived from Tc, Te, and the compressor
load.
* From the preparing operation to the defrost operation, and from the defrost operation to the
operation after defrost, the compressor stops for 1 minute to reduce noise on changing of the
four-way valve.
Outdoor unit actuator
Defrost preparation
operation
Defrost operation
Post Defrost operation
Compressor
52 Hz
177 Hz
2-step increase from
52 Hz to
(Pc - Pe>58 psi)
every 20 sec.
Outdoor unit fan
STEP 8
OFF
STEP 8
Four-way valve
ON
OFF
ON
Main electronic expansion valve
(EV1)
SH control
1400 pls
200~400 pls
Subcooling electronic expansion
valve (EV2)
0 pls
0 pls
0 pls
Hot gas bypass valve (SVP)
OFF
ON
ON
Receiver gas discharging valve
(SVG)
ON
ON
OFF
Ending conditions
130 sec.
•
15 min.
•
Tb >51.8
°
F
•
160 sec.
•
Pc - Pe>58 psi
or
or
Indoor unit actuator
During defrost
Fan
Thermostat ON unit
OFF
Stopping unit
OFF
Thermostat OFF unit
OFF
Electronic expansion valve
Thermostat ON unit
500 pls
Stopping unit
500 pls
Thermostat OFF unit
500 pls
Summary of Contents for SkyAir FCQ18PVJU
Page 1: ...Split System Air Conditioners SkyAir Inverter R 410A Heat Pump 60Hz P Series SiUS28 902_a...
Page 44: ...Other Control SiUS28 902_a 37 Function...
Page 81: ...SiUS28 902_a Troubleshooting by Remote Controller Troubleshooting 74...
Page 185: ...SiUS28 902 Precautions for New Refrigerant R 410A Precautions for New Refrigerant R 410A 178...