
3
|
Components
Service manual
47
RXM20~71R + ARXM25~71R + FTXM20~71R + ATXM25~50R +
FVXM25~50A
Split New Perfera R32
ESIE20-11 – 2021.01
To install the 4-way valve body
1
Install the 4‑way valve in the correct location.
INFORMATION
If any refrigerant pipes were cut during removal of the 4‑way valve body, ALWAYS
install new pipes.
2
Supply nitrogen to the refrigerant circuit. The nitrogen pressure MUST NOT
exceed 0.02 MPa.
3
Wrap a wet rag around the 4‑way valve and solder the 4‑way valve pipes to
the refrigerant pipes.
CAUTION
Overheating the valve will damage or destroy it.
4
After soldering is done, stop the nitrogen supply after the component has
cooled‑down.
a
b
a
c
A
A
Class 20~35 unit
a
4‑way valve pipe
b
4‑way valve
c
Putty
c
a
b
a
A
A
Class 42~71 unit
a
4‑way valve pipe
b
4‑way valve
c
Putty