![background image](http://html1.mh-extra.com/html/daikin/fhq100buv3b/fhq100buv3b_service-manual_2459262239.webp)
ESIE05-04
Field Settings
Part 4 – Commissioning and Test Run
4–15
3
4
5
1
2.6
Setting the Ceiling Height
Incorrectly setting
If you set the controller incorrectly, a connection mistake malfunction “
UA
” will appear on the remote
controller display.
See ’Malfunctioning Field Setting Switch (UA)’ on page 3–50.
Mode No. 13 or 23
First code No. 0
Set the second code No., according to the tables below.
FHQ
FAQ
FCQ and FUQ
Second code No.
Ceiling-suspended type
01
Height < 2.7 m
02
2.7 m < height < 3.5 m
03
Not used
Second code No.
Wall-mounted type
01
Normal
02
High
03
Extra high
Indoor unit
Second code No.
4-way outlet
3-way outlet
2-way outlet
FCQ35-71
01
< 2.7 m
< 3.0 m
< 3.5 m
02
< 3.0 m
< 3.3 m
< 3.8 m
03
< 3.5 m
< 3.5 m
—
FCQ100-125-140
01
< 3.2 m
< 3.6 m
< 4.2 m
02
< 3.6 m
< 4.0 m
< 4.2 m
03
< 4.2 m
< 4.2 m
—
FUQ
01
< 2.7 m
< 3.0 m
< 3.5 m
02
< 3.0 m
< 3.5 m
< 3.8 m
03
< 3.5 m
< 3.8 m
—
Summary of Contents for FHQ100BUV3B
Page 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Page 2: ......
Page 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Page 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Page 78: ...ESIE05 04 1 60 Part 1 System Outline...
Page 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Page 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Page 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Page 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Page 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Page 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Page 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...