![background image](http://html1.mh-extra.com/html/daikin/fhq100buv3b/fhq100buv3b_service-manual_2459262116.webp)
Switch Box Layout
ESIE05-04
1–98
Part 1 – System Outline
3
1
1
4
5
5.4
FCQ71, 100, 125 140D
The illustration below shows the switch box layout:
PCB3 X1M
X2M
PCB2
PCB1
Item
Description
PCB1
Printed circuit board (A1P), power circuit
PCB2
Printed circuit board (A2P), control circuit
PCB3
Printed circuit board (A3P)
X1M
Teminal strip (for P1/P2, F1/F2)
X2M
Teminal strip ( for interconnection wiring)
Summary of Contents for FHQ100BUV3B
Page 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Page 2: ......
Page 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Page 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Page 78: ...ESIE05 04 1 60 Part 1 System Outline...
Page 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Page 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Page 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Page 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Page 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Page 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Page 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...